LEGISLATIVE RESEARCH CENTER
File #: 19-294    Name:
Type: Consent Item Status: Agenda Ready
File created: 2/25/2019 In control: Broken Arrow Municipal Authority
On agenda: 3/5/2019 Final action:
Title: Approval of and authorization to execute Change Order CO2 for Construction Contract with Walters Morgan Construction Inc. on Verdigris River Water Treatment Plant Pretreatment Basin Expansion (Project No. 175436)
Attachments: 1. VRWTP Pretreatment Basin - Change Order #2
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Broken Arrow Municipal Authority
Meeting of: 3-5-19

Title:
title
Approval of and authorization to execute Change Order CO2 for Construction Contract with Walters Morgan Construction Inc. on Verdigris River Water Treatment Plant Pretreatment Basin Expansion (Project No. 175436)
End
Background:
Over the past three years of operation of the Verdigris River Water Treatment Plant, the raw water quality during the warm weather months has created challenges with producing settled water quality within turbidity goals for optimum membrane filtration operation. The purpose of this project will provide improvements to the pretreatment basin. The project consists of construction of two (2) rapid mix basins, two (2) train flocculation basins with plate settlers, a residual collection and pumping system and modifications to the chemical feed storage and pumping system and all appurtenances. The project was advertised for bid on July 23, 2018. Bids were opened on August 14, 2018, with the lowest responsible bidder being Walters-Morgan Construction, Inc., with a Base Bid of $6,702,000.00, Alternate A of $74,000, Alternate B of $57,000 for a Total Lump Sum Bid of $6,833,000. A Notice to Proceed was issued to the contractor on August 8th, 2018.


This Change Order #2 addresses the following additions to the contract:

Total Number of Days Added by this Change Order:
- (2) Additional contract calendar days have been requested due to the additional
installation of pipe.

CO2-1 - Per the request of the Utilities Department, the contractor is to delete 1 each specified float at each Drain Pump Station location, add 1 each "Flyght Multitrode" probe at each Drain Pump Station for Low Level indication, and add MTR relay to accept probe signal in appropriate panel. The below costs summarize the associated costs and applicable markups such to provide a complete in place product.

CO2-2 - During con...