File #: 24-497    Name:
Type: Consent Item Status: Agenda Ready
File created: 4/8/2024 In control: Broken Arrow Municipal Authority
On agenda: 4/16/2024 Final action:
Title: Approval of and authorization to execute a Professional Consultant Agreement with Holloway, Updike, and Bellen, Inc. (HUB) for Tiger Hill East Water Tank Restoration (Project No. 2454460)
Attachments: 1. 2454460 Tiger Hill East Tank Rehab Professioanl Consultant Agreement_Signed
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Broken Arrow Municipal Authority

Meeting of: 04-16-2024

 

Title:

title

Approval of and authorization to execute a Professional Consultant Agreement with Holloway, Updike, and Bellen, Inc. (HUB) for Tiger Hill East Water Tank Restoration (Project No. 2454460)

End

 

Background:

In 2023 the BAMA contracted with Steward Tank Consulting, Inc. to inspect the Two-million-gallon (2 MG) Tiger Hill East Tank due to suspected structural deficiencies in the tank.  The report confirmed structural issues were present in the tank and identified other improvements that should be made to improve tank operations. The report recommendations consist of repairing the roof structure and corroded areas, powerwashing and painting the interior and exterior surfaces, and replacing the interior and epoxy coating systems as well as addressing other minor tank modifications.

Engineering and Construction Department negotiated a Professional Consultant Agreement with HUB to design and prepare construction documents, assist during bidding and construction, and prepare construction contract closeout documents for the East 2 MG Tiger Hill Water Storage Tank Restoration project (attached).  The negotiated amount is $109,400.00.

 

Cost:                                                                $109,400.00

Funding Source:                     Oklahoma Water Resources Board (OWRB)

Requested By:                      Charlie Bright, P.E., Director of Engineering & Construction

Approved By:                      City Manager’s Office

Attachments:                                          Professional Consultant Agreement

 

Recommendation:

recommend

Approve and authorize execution of a Professional Consultant Agreement with Holloway, Updike, and Bellen, Inc. (HUB) for Tiger Hill East Water Tank Restoration (Project No.2454460)

end