Broken Arrow Municipal Authority
Meeting of: 04-06-2021
Title:
title
Approval of and authorization to execute a Professional Consultant Agreement with Holloway, Updike, and Bellen, Inc. for the South Park South Lift Station Relief Line (Project No. 2154280)
End
Background:
The project consists of the demolition of the existing South Park South Lift Station that is in poor condition and designing approximately 2,100 linear feet of a new gravity sanitary sewer relief line. The proposed gravity flow system will connect to an existing trunk line located near the existing lift station. A permanent easement is needs to be acquired by the City as well as approval from the Oklahoma Department of Environmental Quality.
An Agreement has been negotiated with Holloway, Updike, and Bellen, Inc. to design the relief line and provide construction documents. The agreement is for $85,000.00.
Cost: $85,000.00
Funding Source: Oklahoma Water Resources Board Loan ORF-21-0028-CW
Requested By: Ethan J.L. Edwards, P.E., Director of Engineering & Construction
Approved By: City Manager’s Office
Attachments: Professional Consulting Agreement
Recommendation:
recommend
Approve and authorize execution of a Professional Consultant Agreement with Holloway, Updike, and Bellen, Inc. for the South Park South Lift Station Relief Line (Project No. 2154280).
end