LEGISLATIVE RESEARCH CENTER
File #: 20-1275    Name:
Type: Public Hearings Status: Held
File created: 10/8/2020 In control: Planning Commission
On agenda: 10/22/2020 Final action:
Title: Public hearing, consideration, and possible action regarding PUD-94W (Planned Unit Development Amendment) and BAZ-2067 (Rezoning), Honey Springs at Battle Creek, 75.276 acres, PUD-94Q/A-CG (Annexed-Commercial General), A-RD (Annexed-Residential Duplex) and A-R-3 (Annexed-Single-family Residential) to PUD-94W/CG, RD and RS-3 (Single-family Residential), southeast corner of Aspen Avenue (145th E. Avenue) and Dearborn Street (41st Street)
Attachments: 1. 2-CASE MAP, 2. 3-AERIAL, 3. 4-COMPREHENSIVE PLAN EXHIBIT, 4. 5-REZONING EXHIBIT, 5. 6-DESIGN STATEMENT, 6. 7-EXHIBIT 'A'- Conceptual Site Plan, 7. 8-Exhibit 'B'- Development Area Plan, 8. 9-APPROVED PUD 94, 9. 10-APPROVED PUD 94Q

Broken Arrow Planning Commission

10-22-2020

 

To:                     Chairman and Commission Members

From:                     Development Services Department

Title: 

title

Public hearing, consideration, and possible action regarding PUD-94W (Planned Unit Development Amendment) and BAZ-2067 (Rezoning), Honey Springs at Battle Creek, 75.276 acres, PUD-94Q/A-CG (Annexed-Commercial General), A-RD (Annexed-Residential Duplex) and A-R-3 (Annexed-Single-family Residential) to PUD-94W/CG, RD and RS-3 (Single-family Residential), southeast corner of Aspen Avenue (145th E. Avenue) and Dearborn Street (41st Street)

End

 

Background:

Applicant:                                          Tim Terral, TEP

Owner:                     BC Land Holding Company, LLC

Developer:                                          BC Land Holding Company, LLC

Engineer:                                          Tulsa Engineering and Planning Associates

Location:                     Southeast corner of Aspen Avenue (145th E. Avenue) and Dearborn Street (41st Street)

Size of Tract                                          75.276 acres

Present Zoning:         PUD-94Q/A-CG, A-RD and A-R-3

Proposed Zoning:                     PUD-94W/CG, RD and RS-3

Comp Plan:                                          Level 2, 3 and 4

 

Planned Unit Development (PUD)-94W involves a 75.276-acre parcel located at the southeast corner of Aspen Avenue (145th E. Avenue) and Dearborn Street (41st Street).  Applicant is requesting a major amendment to PUD-94/PUD-94Q and is requesting that the underlying zoning be changed (BAZ-2067) from A-CG (Annexed-Commercial General), A-RD (Annexed-Residential Duplex) and A-R-3 (Annexed-Single-family Residential) to CG (Commercial General), RD (Residential Duplex) and RS-3 (Single-family Residential). 

 

PUD-94 BACKGROUND

On June 20, 1994, the City Council approved Ordinance No. 1862 to annex a tract of land (a 479-acre area of Section 27, T19N, R14E) into the corporate limits of the City of Broken Arrow with assigned “Annexed” zoning of AC-2, AR-4 and AR-3 (now converted to A-CG, A-RD and A-R-3). The 786.5-acre Battle Creek planned unit development (PUD-94) was approved by the City Council on November 16, 1995. Also approved on this date was BAZ-1236 to rezone property within the northern portion of the Battle Creek PUD (that had been annexed from the City of Tulsa) to designations that were in accordance with the Zoning Ordinance, subject to platting. For this project site, it rezoned the property from A-R3 (Annexed-Single-family Residential-3), AR-4 (Annexed-Two-family Residential) and AC-2 (Annexed-Planned Shopping Center) to R-3, R-4 and C-2, subject to platting. With the 2008 Zoning Ordinance update, these zoning designations have been converted to R-3 (Single-family Residential-3), RD (Residential Duplex), and CG (Commercial General). Some portions of north Battle Creek have been platted but the northernmost property that is the subject of this rezoning and PUD amendment has not yet been platted. When this property is platted, the zoning designations approved with BAZ-1236 will be codified.  However, the boundaries for each use area are being changed with this PUD amendment and rezoning. 

 

On January 5, 2010, the City Council approved BACP-105, an appeal of the Planning Commission action regarding a request to amend the Comprehensive Plan land use designation for 95.89 acres within PUD-94. The request involved two separate areas including 75.33 acres at the southeast corner of Aspen Avenue and Dearborn Street and 20.56 acres located north of the Broken Arrow Expressway, east of Aspen Avenue. The amendment reallocated the areas of Levels 2, 3 and 4 in the area southeast of Aspen Avenue and Dearborn Street as noted above, and it converted 11.38 acres of Level 6 (Regional Employment/Commercial) and 9.18 acres of Public Recreation to 20.56 acres of Level 3 (Transition Area). A condition of this approval required an amendment to PUD-94. On September 24, 2020, the Planning Commission recommended approval (5-0 vote) of BACP-170 to change the Comprehensive Plan land use designations for this area by increasing the amount of Level 2 and Level 3 and decreasing the amount of Level 4 (Commercial/Employment Nodes). This Comprehensive Plan amendment is scheduled for the October 20, 2020 City Council meeting.

 

As a part of the approval of PUD-94, density limits were established for different types of housing within the development. PUD-94 allows for translocation of densities and land use areas within the project boundaries provided that the general concept and character of the PUD are not altered and the density of each tract is not increased by more than 25 percent if that density is available from other parcels (see page 35 of PUD-94). On June 7, 2010, the City Council approved PUD-94Q, a major amendment to decrease the commercial area on this site from 23.3 acres to 9.99 acres and the area that had previously been designated for villas (apartments) from 23.6 acres to 5.83 acres and amended the use of this area for patio homes. The higher density villas use was transferred to the property to the north of the Broken Arrow Expressway, east of Aspen Avenue. This amendment also increased the area for executive home sites from 28.43 acres to 59.51 acres. The approval was subject to the property being platted and in accordance with Supplemental Development Standards. With this approval, the density for the property at Aspen Avenue and Dearborn Street was decreased. 

 

BAZ-2067 and PUD-94W PROPOSAL

BAZ-2067 modifies the areas zoned for commercial use, patio homes and single-family executive home sites in a manner that preserves the creeks and ponds with commercial and patio home areas designated along Dearborn Street and single-family on the south and east portion of the site. The creeks and ponds are proposed to be in a reserve area.

 

Existing  Zoning District

Proposed  Zoning District

Existing  Acreage

Proposed  Acreage

A-CG (Annexed-Commercial General)

CG (Commercial General)

9.99

4.50

A-RD (Annexed-Residential Duplex)

RD (Residential Duplex) 44 Patio Homes

5.83

8.61

A-R-3 (Annexed-Residential,  Single-family)

RS-3 (Residential, Single-family) 175 Single-family Homes

59.53

62.17

 

With PUD-94W, applicant proposes to amend the use areas to reflect the sensitive features on the site and modify the development standards to allow for reduced lot frontage. While some lots are proposed to have 60 feet of frontage, 55 percent of lots will meet the RS-3 dimensional standards.  To preserve the existing jurisdictional wetlands and ponds, approximately 14.75 acres is being preserved in reserves as open space. In addition to standard sidewalks, pedestrian connectivity is proposed to the open space areas.

 

A summary comparison between what is required by the Zoning Ordinance and what is being proposed with PUD-94W is provided below.

 

SUMMARY OF DEVIATION FROM THE BROKEN ARROW ZONING ORDINANCE FOR COMMERCIAL (TRACT A)

 

Item

Broken Arrow Zoning Ordinance

PUD-94W Request

Permitted Uses

As permitted within the CG District by right or Specific Use Permit

Per Zoning Ordinance

Freestanding Signs

Sign Ordinance update (Ord. No. 3586) approved by City Council on February 18, 2020.

Signage requirements to meet updated Sign Ordinance (Ord. No. 3586) rather than Sign Ordinance that was in effect at the time that PUD-94 was approved. 

 

SUMMARY OF DEVIATION FROM THE BROKEN ARROW ZONING ORDINANCE FOR                PATIO HOMES (TRACT B)

 

Item

Broken Arrow Zoning Ordinance

PUD-94W Request

Permitted Uses

As permitted within the RD District by right or Specific Use Permit

Per Zoning Ordinance

Development Standards

Established with the approved PUD-94 and PUD-94Q. No changes are proposed.

 

SUMMARY OF DEVIATION FROM THE BROKEN ARROW ZONING ORDINANCE FOR           SINGLE-FAMILY/EXECUTIVE HOMESITES (TRACT C)

 

Item

Broken Arrow Zoning Ordinance

PUD-94W Request

Permitted uses

As allowed in the RS-3 district

Per Zoning Ordinance

Lot area

7,000 square feet

6,500 square feet

Lot frontage

60 feet

60 feet (at building line)

Front yard setback

25 feet (may be reduced to 15 feet on corner lot if no driveway access)

Per Zoning Ordinance

Minimum rear yard

20 feet

20 feet

Side yard setback

10 feet total, minimum 5 feet on one side

5 feet/5 feet

Side yard abutting public street

25 feet (may be reduced to 15 feet on corner lot and no driveway access)

15 feet (garage openings permitted if increased to 20 feet)

Minimum yard abutting arterial street

35 feet

25 feet (front or side yard)

Maximum building height

35 feet or 2.5 stories

2 stories (35 feet ) per the approved PUD

Landscaping

One tree per 50 feet of arterial street frontage

Per Zoning Ordinance, per the approved PUD-94Q

Access

Access on arterial streets must be 250 feet apart, centerline to centerline on the same side of the street, and 200 feet, centerline to centerline, on the opposite side of the street.  On collector streets, such as Albany Drive, access points must be 150 feet apart, centerline to centerline.

One access point is proposed on Aspen Avenue and one is proposed on Dearborn Street. Each of these will be greater than 300 feet from the nearest intersection. Additionally, the development is proposed to connect to two existing stub streets to the south.

Sidewalks

5-feet wide on arterial streets and 4-feet wide on collector streets.

Per Zoning Ordinance

 

SURROUNDING LAND USES/ZONING/COMPREHENSIVE PLAN

 

The surrounding properties contain the following uses, along with the following development guide and zoning designations:

                     

 Location

 Development Guide

 Zoning

 Land Use

North

City of Tulsa

CS, RM-2, RS-3

Dearborn Street, Single-family residential and vacant land beyond

East

City of Tulsa

AG

Undeveloped land

South

Level 2

R-3/PUD-94

Single-family residential

West

City of Tulsa

AG

Aspen Avenue, Vacant land beyond

                     

The property associated with PUD-94W and BAZ-2067 is designated as Level 2, 3 and 4 in the Comprehensive Plan.  The RS-3 (Single-family Residential), RD (Residential Duplex) and CG (Commercial General) zoning districts are considered to be in conformance with the Comprehensive Plan in these levels. 

 

According to Section 6.4 of the Zoning Ordinance, the PUD provisions are established for one (1) or more of the following purposes:

 

1.                       To permit and encourage innovative land development while maintaining appropriate limitation on the character and intensity of use and assuring compatibility with adjoining and proximate properties.

 

2.                       To permit greater flexibility within the development to best utilize the physical features of the particular site in exchange for greater public benefits than would otherwise be achieved through development under this Ordinance.

 

3.                     To encourage the provision and preservation of meaningful open space.

 

4.                      To encourage integrated and unified design and function of the various uses comprising the planned unit development.

 

5.                       To encourage a more productive use of land consistent with the public objectives and standards of accessibility, safety, infra structure and land use compatibility.

 

In Staff’s opinion, PUD-94W satisfies items 1, 2, 3, and 5 of Section 6.4.A of the Zoning Ordinance.  (1) The preservation of sensitive lands in reserve areas and for use as open space maintains the character of the natural setting and limits the intensity of use. (2) The preservation of approximately 14.75 acres of sensitive lands limits the density of the development and provides flexibility as development is planned around sensitive sites. Utilizing natural drainage areas limits impacts to the stormwater drainage system thereby providing a greater public benefit. These modifications permit greater flexibility than could otherwise be achieved through the Zoning Ordinance. (3) With PUD-94W, applicant proposes to preserve 14.75 acres as open space that includes a park and pedestrian connectivity. (5) While modifying the boundaries of the different use areas, the proposed PUD-94W is compatible with the approved master plan for Battle Creek. The design of the development meets the public objectives and standards of accessibility and safety in that proposed access points exceed separation requirements and provides connectivity.  

 

The site includes ponds and creeks but according to FEMA maps, none of the property is located in a 100-year FEMA floodplain area. As part of the engineering process, these areas will need to be mapped. Water and sanitary sewer service will be provided by the City of Broken Arrow. 

 

Attachments:                                Case map
                                   Aerial
                                   Comprehensive Plan Exhibit
                                   Rezoning Exhibit
                                   Design Statement
                                   Exhibit ‘A’ Conceptual Site Plan
                                   Exhibit ‘B’ Development Area Plan
                                   Approved PUD-94
                                   Approved PUD-94Q
                                     

Recommendation:                      

Based upon the Comprehensive Plan, the location of the property, and the surrounding land uses, Staff recommends that PUD-94W and BAZ-2067 be approved as presented, subject to the property being platted.

 

Reviewed by:  Jill Ferenc

 

Approved by:  Larry R. Curtis 

 

JMW