Title: Consideration, discussion and possible approval of the Schematic Design of the Senior Center (Project No. 191719)
Attachments: 1. Schematic Design Drawings
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Broken Arrow City Council

Meeting of: 05-19-2020

 

Title:

title

Consideration, discussion and possible approval of the Schematic Design of the Senior Center (Project No. 191719)

End

 

Background:

In 2018, the voters in Broken Arrow approved of the construction of a new Senior Center as part of the 2018 GO Bond Program.  The facility is to be located on Main Street across the street from the existing center.  The building is intended to create more activity rooms and larger spaces to accommodate more members as the program grows.  In addition to the building, the site is being designed with additional parking spaces that exceed the number required for the building.  These parking spaces are intended to help with overflow parking at Arrowhead Softball Park.  There will be a walkway constructed at the back of the parking lot that ties into the park. 

 

In 2019, City Council approved an Agreement for Professional Consultant Services with Chase Fetters Hewitt as the Architect to design this project.  City staff has worked closely with Chase Fetters Hewitt and the user group to come up with a building layout that fulfills their purpose and stays within the budget provided in the bond.  After many iterations, City Staff and the user group has accepted the attached Schematic Design and is recommending its approval so the Architect can begin detailed Design Drawings.

 

 

Cost:                                                                $5,800,000

Funding Source:                     General Obligations Bond 2018

Requested By:                      Ethan J.L. Edwards, P.E., Director of Engineering and Construction

Approved By:                      City Manager’s Office

Attachments:                                          Senior Center Activity Center - Schematic Design Drawings

Recommendation:

recommend

Accept the Schematic Design of the Senior Center, approve and authorize City Staff and the Architect to proceed with detailed Design Drawings (Project No. 191719)

end