LEGISLATIVE RESEARCH CENTER
File #: 19-1362    Name:
Type: Consent Item Status: Agenda Ready
File created: 10/29/2019 In control: Broken Arrow City Council
On agenda: 11/18/2019 Final action:
Title: Acceptance of the Drainage Advisory Committee's recommendation of the design and construction of a storm sewer system between Stone Wood Crossing I and Stone Wood Crossing II and direct staff to obtain an easement for such drainage improvements and authorize the expenditure of 2018 GO bond, Proposition 6 funds for the improvements
Attachments: 1. Drainage Project Report, 2. Application, 3. Map, 4. Stone Wood Crossing Plat, 5. Reserve photos, 6. Stone Wood Crossing II - Proposed Layout, 7. Engineer Estimate, 8. Drainage Advisory Committee Draft Minutes 10-28-19
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Broken Arrow City Council
Meeting of: 11-18-2019

Title:
title
Acceptance of the Drainage Advisory Committee's recommendation of the design and construction of a storm sewer system between Stone Wood Crossing I and Stone Wood Crossing II and direct staff to obtain an easement for such drainage improvements and authorize the expenditure of 2018 GO bond, Proposition 6 funds for the improvements
End

Background:
The outfall from the dry detention pond located in the southwest corner of the Reserve at Battle Creek Subdivision drains into the municipal stormwater system and into pond 2 of Stone Wood Crossing II. The lots in the Reserve at Battle Creek south of W Granger St drain into the lots of Stone Wood Crossing I & Stone Wood Crossing II, not into the subdivision's detention basin. This fact coupled with the runoff generated from the properties in Stone Wood Crossing draining towards the ponds across flatter slopes causes standing and stagnant water along some of these lots. In addition, it also erodes certain properties near the pond.
After reviewing the information presented in the staff report, the Drainage Advisory Committee recommended approval (5-0) of No. 19-001 as per staff recommendation. Proposition 6 of the 2018 GO Bonds provides funds for the purpose of drainage improvements to property owned exclusively or in part by the City. The City will need to obtain an easement to make the recommended improvements.
The project is located in the Haikey Creek basin.



Cost: $65,000.00
Funding Source: 2018 GO Bond, Proposition 6
Requested By: Patrick Wilson, Stormwater Division Manager
Approved By: City Manager's Office
Attachments: Drainage Advisory Committee Case No 19-001
Drainage Advisory Committee Draft Minutes 10-28-19

Recommendation:
recommend
Accept the Drainage Advisory Committee's recommendation of the design and construction of a storm sewer system between Stone Wood Crossing I and Stone Wood Crossing ...

Click here for full text