Broken Arrow City Council
Meeting of: October 1, 2019
Title:
title
Approval of and authorization to execute a Professional Services Agreement with Cowan Group Engineering, LLC, for design of Stone Ridge Towne Center Drainage Improvements Packages “B”, “C”, and “D” (Project No. SW1910)
End
Background:
The 2018 General Obligation Bond Stormwater package included a project consisting of drainage improvements in the vicinity of Stone Ridge Towne Center located at the northeast corner of Albany Street (61st Street South) and Elm Place ((161st East Avenue). Engineering & Construction Department staff negotiated an agreement with Cowan Group Engineering, LLC for providing engineering services to complete the Stone Ridge Towne Center Drainage Improvements project.
The project includes completion of final design plans for Packages “B”, ”C”, and “D” which consist of culvert upgrades beneath the Broken Arrow Expressway (SH-51) and Southwest Expressway Boulevard. The project also includes services for the following: identification of easement needs, preparation of easement documents, assistance during acquisition, identification of utility relocation needs, preparation of construction cost estimates, and the coordination of utility relocations.
Cost: $79,750.00
Funding Source: 2018 General Obligation Bond
Requested By: Kenneth D. Schwab, P.E., CFM, Assistant City Manager - Operations
Approved By: City Manager’s Office
Attachments: Agreement for Professional Consulting Services
Recommendation:
recommend
Approve and authorize execution of Professional Services Agreement with Cowan Group Engineering, LLC, for design of Stone Ridge Towne Center Drainage Improvements Packages “B”, ”C”, and “D” (Project No. SW1910).
end