LEGISLATIVE RESEARCH CENTER
File #: 19-380    Name:
Type: Consent Item Status: Agenda Ready
File created: 3/25/2019 In control: Broken Arrow Municipal Authority
On agenda: 5/7/2019 Final action:
Title: Approval of and authorization to execute a Professional Consultant Agreement with Holloway, Updike, and Bellen, Inc. (HUB) for Omaha Water Storage Tank Restoration
Attachments: 1. Professional Consultant Agreement
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Broken Arrow Municipal Authority

Meeting of: 05-07-2019

                                                                                    

Title: 

title

                     Approval of and authorization to execute a Professional Consultant Agreement with Holloway, Updike, and Bellen, Inc. (HUB) for Omaha Water Storage Tank Restoration 

End

 

Background:

In 2014 the BAMA contracted with Utility Service Group to do a condition assessment report on the Omaha water storage tank.  The report recommendations were to restore the Omaha Tank. Restoration will consist of repairing the roof structure and corroded areas, powerwashing and painting the interior and exterior surfaces, and replacing the interior and epoxy coating systems. 

 

Engineering and Construction Department negotiated a Professional Consultant Agreement with HUB to design and prepare construction documents, assist during bidding and construction, and prepare construction contract closeout documents for the Omaha Water Storage Tank Restoration project (attached).  The negotiated amount is $88,000.00.

 

Cost:                                                                $88,000.00

Funding Source:       Reallocation of the 2015 FAP Loan from the Oklahoma Water Resource Board. (OWRB)

Requested By:                      Alex Mills, P.E., Director of Engineering and Construction

                                   

Approved By:                      City Manager Office
                                

Attachments:                                          Professional Consultant Agreement

Recommendation:

recommend

Approve and authorize execution of the Professional Consultant Agreement with Holloway, Updike, and Bellen, Inc. (HUB) for Omaha Water Storage Tank Restoration.

end