LEGISLATIVE RESEARCH CENTER
File #: 19-224    Name:
Type: Consent Item Status: Agenda Ready
File created: 1/30/2019 In control: Broken Arrow City Council
On agenda: 2/19/2019 Final action:
Title: Approval of PT18-109, Conditional Final Plat, Boston Heights, a replat of Lot One, Block Two Arrow Acres, 2.10 acres, 7 Lots, A-1 to RS-2, one-half mile east of Elm Place, one-quarter mile south of Washington Street
Attachments: 1. 1-PLANNING COMMISSION FACT SHEET, 2. 2-CHECKLIST.BOSTON HEIGHTS, 3. 3-CONDITIONAL FINAL PLAT AND COVENANTS.BOSTON HEIGHTS
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Broken Arrow City Council
Meeting of: 02-19-2019

To: Mayor and City Council Members
From: Development Services Department
Title:
title
Approval of PT18-109, Conditional Final Plat, Boston Heights, a replat of Lot One, Block Two Arrow Acres, 2.10 acres, 7 Lots, A-1 to RS-2, one-half mile east of Elm Place, one-quarter mile south of Washington Street
End
Background:
PT18-109, the conditional final plat for Boston Heights, contains 2.10 acres and is proposed to be divided into seven lots and one reserve area. This property, which is located one-half mile east of Elm Place, one-quarter mile south of Washington Street, is presently zoned A-1. On January 2, 2018, the City Council approved BAZ-1991 to change the zoning on the property from A-1 to RS-2 (Single-Family Residential). BAZ-1991 was approved subject to the property being platted.

Boston Heights is a replat of Lot 1, Block 2 Arrow Acres. The plat for Arrow Acres was recorded in Tulsa County on January 19, 1953.

According to the FEMA maps, none of the property is located within a 100-year floodplain. On-site stormwater detention is required and is being installed in Reserve A on the west part of the property.

Water and sanitary sewer service will be provided by the City of Broken Arrow. An existing sanitary sewer line runs north/south through the property. New sanitary sewer lines are being installed to connect with this existing lines. A new water line is being installed along Boston Street.

On January 24, 2019, the Planning Commission recommended approval (3-0) of the conditional final plat, subject to the attached checklist.

Cost: $0

Prepared By: Brent Murphy, AICP, Senior Planner

Reviewed By: Development Services Department
Legal Department
Assistant City Manager, Operations

Approved By: Michael L. Spurgeon, City Manager

Attachments: Planning Commission Fact Sheet
Ch...

Click here for full text