LEGISLATIVE RESEARCH CENTER
File #: 19-217    Name:
Type: General Business Status: Agenda Ready
File created: 1/29/2019 In control: Broken Arrow City Council
On agenda: 2/5/2019 Final action:
Title: Consideration, discussion and possible award of the lowest responsible bid to Utility Supply, Inc. and approve and authorize execution of materials contract for the Washington Street Waterline Relocation from Garnett Rd to Olive Ave (ST1616)
Attachments: 1. Certified Bid Tab
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Broken Arrow City Council

                                                                                                 Meeting of: 02-05-2019

                                                                                    

Title: 

title

                     Consideration, discussion and possible award of the lowest responsible bid to Utility Supply, Inc. and approve and authorize execution of materials contract for the Washington Street Waterline Relocation from Garnett Rd to Olive Ave (ST1616)
 

End

Background:

The improvements on Washington Street from Garnett Road to Olive Avenue require the waterline to be relocated from the north to the south side of Washington Street.  To expedite the commencement of construction, the waterline materials were bid separately, allowing the materials to be delivered at the same time the contractor moves on site to begin construction.

 

The project was advertised for bid on December 28 and January 4, 2018.  Bids were opened on January 23, 2019, with five (5) bids being received and two of the five considered nonresponsive as they did not submit a complete bid.  The Certified Bid Tabulation is attached.  The bids submitted were composed of thirty nine (39) pay items to form the Total Base Bid. The lowest responsible bidder was Utility Supply, Inc., with a Total Bid of $270,774.60. The engineer’s estimate was $217,672.50.

 

Cost:                                                                $270,774.60

 

Funding Source:       General Obligation Bond 2014

 

Requested By:                      Alex Mills, P.E., Engineering and Construction Director

                                   

Approved By:                      Michael L. Spurgeon, City Manager 

Attachments:                                          Certified Bid Tabulation

Recommendation:

recommend

Consideration, discussion and possible approval award the lowest responsible bid to Utility Supply, Inc. and approve and authorize execution of materials contract for the Washington Street Waterline Relocation from Garnett Rd to Olive Ave (ST1616)