Broken Arrow City Council
Meeting of: 02-05-2019
Title:
title
Consideration, discussion and possible award of the lowest responsible bid to Utility Supply, Inc. and approve and authorize execution of materials contract for the Washington Street Waterline Relocation from Garnett Rd to Olive Ave (ST1616)
End
Background:
The improvements on Washington Street from Garnett Road to Olive Avenue require the waterline to be relocated from the north to the south side of Washington Street. To expedite the commencement of construction, the waterline materials were bid separately, allowing the materials to be delivered at the same time the contractor moves on site to begin construction.
The project was advertised for bid on December 28 and January 4, 2018. Bids were opened on January 23, 2019, with five (5) bids being received and two of the five considered nonresponsive as they did not submit a complete bid. The Certified Bid Tabulation is attached. The bids submitted were composed of thirty nine (39) pay items to form the Total Base Bid. The lowest responsible bidder was Utility Supply, Inc., with a Total Bid of $270,774.60. The engineer’s estimate was $217,672.50.
Cost: $270,774.60
Funding Source: General Obligation Bond 2014
Requested By: Alex Mills, P.E., Engineering and Construction Director
Approved By: Michael L. Spurgeon, City Manager
Attachments: Certified Bid Tabulation
Recommendation:
recommend
Consideration, discussion and possible approval award the lowest responsible bid to Utility Supply, Inc. and approve and authorize execution of materials contract for the Washington Street Waterline Relocation from Garnett Rd to Olive Ave (ST1616)