LEGISLATIVE RESEARCH CENTER
File #: 19-182    Name:
Type: Ordinance Status: Agenda Ready
File created: 1/22/2019 In control: Broken Arrow City Council
On agenda: 2/5/2019 Final action:
Title: Consideration, discussion, and possible adoption of Ordinance No. 3558, an ordinance amending the Broken Arrow Code of Ordinances, Appendix A, Zoning Ordinance, Chapter 5, Development Standards, Section 5.8, District-specific standards, Subsection D, Downtown residential overlay district (DROD), specifically sub-paragraph 1, Purpose; adopting Design Standards-Downtown Residential Overlay District- 2019, repealing all ordinances to the contrary and declaring an emergency
Attachments: 1. 1-ORDINANCE NO. 3558, 2. 2-Supplement A-Downtown Residential Overlay District
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Broken Arrow City Council

Meeting of: 02-05-2019

 

Title:

title

Consideration, discussion, and possible adoption of Ordinance No. 3558, an ordinance amending the Broken Arrow Code of Ordinances, Appendix A, Zoning Ordinance, Chapter 5, Development Standards, Section 5.8, District-specific standards, Subsection D, Downtown residential overlay district (DROD), specifically sub-paragraph 1, Purpose; adopting Design Standards-Downtown Residential Overlay District- 2019, repealing all ordinances to the contrary and declaring an emergency

End

 

Background:

Section 5.8.D of the Zoning Ordinance is proposed to be modified to update the Downtown Residential Overlay District (DROD) requirements. The DROD was approved by the City Council in December 2017 and has been in effect since January 2, 2018. Since that time, approximately 7 homes have been constructed in the Downtown Area using the DROD. The following updates are proposed to modify the DROD standards.

 

Transitional setbacks are proposed to be removed from the DROD standards. Each building form section makes reference to transitional setbacks. These references are being removed on the pages identified in the following chart.

 

Additional information is being provided in the notes section of the single-family and two family building form categories to clarify setbacks on corner lots, driveway and garage widths and alley access. The other proposed changes simply further define finished floor height as stem wall height and note the maximum front wall width as a maximum continuous wall width. Detailed changes are noted below.

 

Item

Zoning Ordinance Requirement

Proposed Modification

Page 22

Transitional Setbacks defined.

Remove Requirement

Page 37

Note 3: For buildings above 1 story, the 2nd story and above must be set back an additional 5’ from the shared lot line. This requirement applies on all side and rear lot lines except where otherwise stated or where the property abuts a lot in Area 5, 6 or 7.

Remove Requirement

Page 37

Added standard.

3. For corner lots, the side of the primary structure that does not have a primary entrance, may be set back 15’ from the property line.

Page 37

Note 8: Where feasible, provide access from an alley.

Modified Note 8: Where feasible, access must be provided from the alley.

Page 37

Note 9: If an alley is present, access must be provided form the alley.

Remove requirement

Page 37

Note 10. On corner lots, garage/carport only has to setback 20 feet from the lot line that has the greatest street frontage.

This will become Note 9.

Page 37

Exhibit Drawing

Replace with updated drawing.

Page 38

Note 1: Only 30’ of total front wall width can be located within 25’ of the front lot line.

Only 30’ of total front wall width can be located within 25’ of the front lot line. The maximum width is a continuous wall. Building activation requirements apply.

Page 41

B: Side Setback

Remove Transitional Setback requirement

Page 41

C: Rear Setback

Remove Transitional Setback requirement

Page 41

Note 2: For buildings above 1 story, the 2nd story and above must be set back an additional 5’ from the shared lot line. This requirement applies on all side and rear lot lines except where otherwise stated or where the property abuts a lot in Area 5, 6 or 7.

Remove Requirement

Page 45

B: Side Setback

Remove Transitional Setback requirement

Page 45

C: Rear Setback

Remove Transitional Setback requirement

Page 45

H: Garage and Carport Location

Remove Carport

Page 45

Note 3: For buildings above 1 story, the 2nd story and above must be set back an additional 5’ from the shared lot line. This requirement applies on all side and rear lot lines except where otherwise stated or where the property abuts a lot in Area 5, 6 or 7.

Remove Requirement

Page 49

B: Side Setback

Remove Transitional Setback requirement

Page 49

C: Rear Setback

Remove Transitional Setback requirement

Page 49

Note 2: For buildings above 1 story, the 2nd story and above must be set back an additional 5’ from the shared lot line. This requirement applies on all side and rear lot lines except where otherwise stated or where the property abuts a lot in Area 5, 6 or 7.

Remove Requirement

Page 53

B: Side Setback

Remove Transitional Setback requirement

Page 53

C: Rear Setback

Remove Transitional Setback requirement

Page 53

Note 3: For buildings above 1 story, the 2nd story and above must be set back an additional 5’ from the shared lot line. This requirement applies on all side and rear lot lines except where otherwise stated or where the property abuts a lot in Area 5, 6 or 7.

Remove Requirement

Page 57

B: Side Setback

Remove Transitional Setback requirement

Page 57

C: Rear Setback

Remove Transitional Setback requirement

Page 57

Note 4: For buildings above 1 story, the 2nd story and above must be set back an additional 5’ from the shared lot line. This requirement applies on all side and rear lot lines except where otherwise stated or where the property abuts a lot in Area 5, 6 or 7.

Remove Requirement

Page 61

Note 2: For buildings above 1 story, the 2nd story and above must be set back an additional 5’ from the shared lot line. This requirement applies on all side and rear lot lines except where otherwise stated or where the property abuts a lot in Area 5, 6 or 7.

Remove Requirement

Page 65

Note 2: For buildings above 1 story, the 2nd story and above must be set back an additional 5’ from the shared lot line. This requirement applies on all side and rear lot lines except where otherwise stated or where the property abuts a lot in Area 5, 6 or 7.

Remove Requirement

Page 75

Finished Ground Floor Height

Clarify this height as the stem wall height

 

The Planning Commission recommended approval of the proposed changes on December 20, 2018. The preview ordinance was reviewed by the City Council on January 15, 2019 and set for adoption.

 

Cost:                                                                $0

Funding Source:                     Source

Requested By:                      Michael Skates, Development Services Director

Approved By:                      Michael L. Spurgeon, City Manager

Attachments:                                          Ordinance No. 3558
                                    Supplement A- Downtown Residential Overlay District
                                   

Recommendation:

recommend

Adopt Ordinance No. 3558 and approve the emergency clause.

end