Title: Award the lowest responsible bid to Cherokee Pride Construction and approve and authorize execution of a construction contract for the Aspen Pond - West Boston Court Drainage improvements (SW1918)
Attachments: 1. SW1918 Certified BId Tabulation
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Broken Arrow City Council

                                                                                                 Meeting of: 2-05-2019

                                                                                    

Title: 

title

                     Award the lowest responsible bid to Cherokee Pride Construction and approve and authorize execution of a construction contract for the Aspen Pond - West Boston Court Drainage improvements (SW1918)
 

End

Background:

Stormwater was ponding at West Boston Court between South Narcissus Court and South Narcissus rendering the street impassible during storm events. The City is responsible for maintenance and repair of city owned streets and storm sewers.  City of Broken Arrow Engineering and Construction Department personnel designed and produced construction plans for bid. The project consists of constructing two new inlets, two new manholes as well as 15” and 30” diameter drainage pipes to improve drainage in West Boston Court within the Aspen Pond Subdivision.

 

The project was advertised for bid on January 7,2019.  Bids were opened on January 29, 2019 and 13 bids were received.  All bids were responsive except one and the lowest responsible bid was from Cherokee Pride Construction for $78,704.00   The engineer’s estimate was $89,275.50 and the Certified Bid Tabulation is attached. 

 

Cost:                                                                $78,704.00

 

Funding Source:       2018 General Obligation Bond Program

 

Requested By:                      Alex Mills, P.E., Engineering and Construction Director

                                   

Approved By:                      Michael L. Spurgeon, City Manager 

Attachments:                                          Certified Bid Tabulation

Recommendation:

recommend

Award the lowest responsible bid to Cherokee Pride Construction and approve and authorize execution of a construction contract for the Aspen Pond - West Boston Court Drainage Improvements (SW1918)