Title: Acknowledgement of submittal of the FY 2018 Lynn Lane Wastewater Treatment Plant Annual Pretreatment Report to the Department of Environmental Quality (DEQ)
Attachments: 1. FY 2018 Lynn Lane Wastewater Treatment Plant Annual Pretreatment Report to DEQ
Broken Arrow Municipal Authority
Meeting of: 11-20-2018

Title:
title
Acknowledgement of submittal of the FY 2018 Lynn Lane Wastewater Treatment Plant Annual Pretreatment Report to the Department of Environmental Quality (DEQ)
End

Background:
City of Broken Arrow is required by Oklahoma Pollutant Discharge Elimination System (OPDES) Permit No. 0040053 to operate a pretreatment program in accordance with Section 402(b)(8) of the Clean Water Act, the General Pretreatment Regulations (40 CFR 403) and the provisions of the approved industrial pretreatment program. In the month of October, the City of Broken Arrow is required to submit a status report to DEQ of the pretreatment program activities for the previous 12 months. City pretreatment staff submitted an annual report to DEQ outlining pretreatment activities for significant industrial users that discharge wastewater to the Lynn Lane Wastewater Treatment Basin. The report is for the period of October 2017 to September 2018.

The following is a summary of the report:

Report of Changes to the Approved Pretreatment Program
There have been no changes made or requested to the current City of Broken Arrow/ Lynn Lane Wastewater Treatment Plant (WWTP) Approved Industrial Pretreatment Program.

A technically based local limit study is in progress and will be submitted to DEQ by May 31, 2019. The sampling plan is attached in Section 7 of the report: Water Quality Based Effluent Concentrations.

Industrial User (IU) Wastewater Survey
The IU Wastewater Survey is continually updated as required. All new non-residential utility customers are given a one-page short survey to fill out before they can obtain water service. The surveys are then forwarded to the pretreatment office. A comprehensive IU Survey is performed every 5 years and will be performed next in 2022.

Report on Pass Through, Upset and/or Interference
Regarding Influent and Effluent priority pollutant scans, all parameters were below both maximum a...