Title: Approval of and authorization to execute Change Order CO1 for Construction Contract 1551425; Citywide Supervisory Control and Data Acquisition (SCADA) System
Attachments: 1. Change Order C01
Broken Arrow Municipal Authority
Meeting of: 11-6-2018

Title:
title
Approval of and authorization to execute Change Order CO1 for Construction Contract 1551425; Citywide Supervisory Control and Data Acquisition (SCADA) System
End
Background:
The BAMA received Oklahoma Eater Resources Board Loan (OWRB) No. FAP-16-0001-L for implementation for a Supervisory Control and Data Acquisition (SCADA) system in 2016. Alan Plumber and Associates, LP was selected to design a system for monitoring and control of 29 wastewater lift stations and 3 water booster station, and improvements to the plant control systems at Lynn Lane Wastewater Treatments Plant. The design was complete in October 2017, and the project was advertised for bids on October 24 and 31, 2017. The contract was awarded to the lowest responsible bid of $1,559,028.00 for the base bid and alternative no. 1 to Prime Controls, LP. OWRB approved the contract award on December 7, 2017. Notice to Proceed for the project was issued February 8, 2018.

This Change Order #1 addresses the following additions to the contract:

CO1-1: The contractor is to install a new fully assembled enclosure with an M221 CPU and OIT assembly at the Greenbriar Pump Station. This change is due to a requested upgrade to the existing PLC for the pump station that will not be compatible with the new system being installed. This work was summarized and directed through RFI#17 of the project and is attached within. The below costs is inclusive of materials, labor, insurance & bonds, and all applicable markups such to produced a complete in place product.

CO1-2: Due to conflicts of the installation of new PLC in CO1-1 as well as some field adjustments required by Utilities department, the contractor is to remove and relocate the previously installed electrical/controls rack at the Greenbriar Pump Station. The location of the revised placement of the rack is to be direc...