LEGISLATIVE RESEARCH CENTER
File #: 18-634    Name:
Type: Consent Item Status: Agenda Ready
File created: 5/25/2018 In control: Planning Commission
On agenda: 6/14/2018 Final action: 6/14/2018
Title: Consideration and possible action regarding request for use of metal exterior building material, ST14-118B, Continental Industries, 19.43 acres, IH, 21808 E. Highway 51 (south of Washington Street on the west side of Highway 51)
Attachments: 1. 2-AERIAL.ST14-118B, 2. 3-PROPOSED BUILDING ELEVATIONS, 3. 4-CONCEPTUAL SITE PLAN, 4. 5-LETTER FROM APPLICANT, 5. 6-GOOGLE EARTH PICTURE LOOKING SOUTH
Broken Arrow Planning Commission
06-14-2018

To: Chairman and Commission Members
From: Development Services Department
Title:
title
Consideration and possible action regarding request for use of metal exterior building material, ST14-118B, Continental Industries, 19.43 acres, IH, 21808 E. Highway 51 (south of Washington Street on the west side of Highway 51)
End

Background:

Applicant: Nicole Watts, KKT Architects, Inc.
Owner: Continental Industries
Developer: Continental Industries
Engineer: KKT Architects, Inc.
Location: 21808 E. Highway 51 (south of Washington Street on the west side of Highway 51)
Size of Tract 19.43 acres
Number of Lots:|910|Present Zoning: IH
Comp Plan: Level 7 (Major Industrial)

Continental Industries, which is located at 21808 E. Highway 51, wants to expand and construct a new office/warehouse building. The building, which will contain up to 100,000 square feet, is proposed to be constructed just west of their current facility.

According to the applicant, because of Continental's corporate structure and the size of the building, the project needs to be broken up into two different fiscal years for financing. Thus the project will be constructed in two phases. The first phase will be a 55,000 square foot warehouse on the south end of the proposed new building. Shortly after the warehouse construction, the two-story office addition will be added onto the north end of the warehouse.

The exterior of the first phase of the building will be entirely metal. According to Section 5.8.H of the Zoning Ordinance, all new construction or renovation of existing structures in the IH district are to have those vertical exteriors that are facing the arterial street or highway constructed of masonry type material. Metal finishes may be considered and approved by the Planning Commission through the site plan review process.

Due to the phasing of construction, applicant is requesting that the warehouse building that will...

Click here for full text