LEGISLATIVE RESEARCH CENTER
File #: 18-336    Name:
Type: Consent Item Status: Agenda Ready
File created: 3/1/2018 In control: Planning Commission
On agenda: 3/8/2018 Final action: 3/8/2018
Title: Approval of ST17-132, Top Dog building elevations, 3.32 acres, A-1/PUD-264, northeast corner of Tucson Street and 9th Street
Attachments: 1. 2-TOP DOG TRAINING SITE PLAN DRAWING, 2. 3-ELEVATIONS, 3. 4-LANDSCAPE PLAN DRAWINGS
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Broken Arrow Planning Commission
03-08-2018

To: Chairman and Commission Members
From: Development Services Department
Title:
title
Approval of ST17-132, Top Dog building elevations, 3.32 acres, A-1/PUD-264, northeast corner of Tucson Street and 9th Street
End

Background:
Applicant: Mark Capron, Sisemore Weisz & Associates
Owner: John Day
Developer: John Day
Engineer: Sisemore Weisz & Associates
Location: Northeast corner of Tucson Street and 9th Street
Size of Tract 3.32 acres
Number of Lots:|910|Present Zoning: A-1/PUD-264
Comp Plan: Level 4

Top Dog Training is proposing to construct new buildings on their property located on the northeast corner of Tucson Street and 9th Street. The property is zoned A-1/PUD-264. PUD-264 was approved by the City Council in their meeting of July 18, 2017.

PUD-264 states that the exterior of all buildings shall meet the building fa?ade requirements of Section 5.8.G.1 of the Broken Arrow Zoning Ordinance. Section 5.8.G.1 of the Zoning Ordinance states that structures adjacent to an arterial street or highway shall have vertical exteriors facing these roadways constructed of masonry, concrete panels, glass block, glass curtain walls, Exterior Insulated Finished Systems (EIFS), or stucco. This section also provides authority to the Planning Commission to consider and approve metal finishes, wood, plastic or other masonry material through the site plan review process. The applicant is requesting approval by the Planning Commission to use a metal exterior building material for building associated with the Top Dog Training site plan.

A site plan was submitted on February 21, 2018 and is under review by Staff. The proposed building is approximately 9,563-square feet and faces both Tucson Street and 9th Street. The proposed fa?ade of the front of the building, facing Tucson Street, is primarily stucco with wood and metal accents. The proposed fa?ade on the west side of the building, facing 9th Street is approximatel...

Click here for full text