LEGISLATIVE RESEARCH CENTER
File #: 18-119    Name:
Type: Consent Item Status: Passed
File created: 12/26/2017 In control: Broken Arrow Municipal Authority
On agenda: 1/2/2018 Final action: 1/2/2018
Title: Approval of and authorization to execute Professional Consultant Agreement with Engineering, Compliance, and Construction, Inc. (ECCI) for Tank Replacement Design Services for the Water Treatment Plant Caustic CIP Tank (Project No. 185436)
Attachments: 1. Contract signed by legal for CC.pdf
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Broken Arrow Municipal Authority

Meeting of: 01-02-2018

                                                                                    

To:                     Chairman and Authority Members

From:                     Engineering and Construction Department

Title: 

title

                     Approval of and authorization to execute Professional Consultant Agreement with Engineering, Compliance, and Construction, Inc. (ECCI) for Tank Replacement Design Services for the Water Treatment Plant Caustic CIP Tank (Project No. 185436)

End

Background:

The original caustic CIP (clean-in-place) fiberglass tank was built by Edwards Fiberglass, Inc. for the Verdigris Water Treatment Plant (WTP) project in 2012.  The chemical solution stored in this tank is used to clean the membrane filter system at the WTP.  An inspection of this and other tanks at the WTP was conducted by ECCI in June 2017.  In the inspection report submitted, several issues were identified based on the external-only inspection of this tank.  These included cracked lifting lugs (currently not suitable for use), a leak in the upper pipe knuckle out of the tank, and no pipe support for the CIP return line piping.

 

It has been determined that tank replacement is necessary.  This Professional Consultant Agreement requires production of construction documents for the replacement of the tank, inspection during the manufacturing of the tank (if directed by BAMA) to ensure that certain fabrication standards are observed, bidding assistance services, onsite inspection services during installation of the new tank, and production of record drawings.

 

Funding for this agreement will be from the Utilities Department Operations and Maintenance (O&M) budget.


Cost:                                                                $  17,000.00

Prepared By:                                           Alex M. Mills, P.E., CFM, Engineering and Construction Director

Reviewed By:                                          Utilities Department
            Finance Department
            Assistant City Manager - Operations                                  

Approved By:                      Michael L. Spurgeon, City Manager

Attachments:                                          Professional Consultant Agreement

Recommendation:

Approve and authorize execution of Professional Consultant Agreement with Engineering, Compliance, and Construction, Inc. (ECCI) for Tank Replacement Design Services for the Water Treatment Plant Caustic CIP Tank