LEGISLATIVE RESEARCH CENTER
File #: 17-2970    Name:
Type: Consent Item Status: Agenda Ready
File created: 11/30/2017 In control: Planning Commission
On agenda: 12/7/2017 Final action:
Title: Approval of PT15-117B, Conditional Final Plat, Ninety One Phase 3, 26.28 acres, A-1 to RS-3, one-quarter mile east of 9th Street, north of Washington Street
Attachments: 1. 2-CHECKLIST.NINETY ONE PHASE 3, 2. 3-CONDITIONAL FINAL PLAT.NINETY-ONE PHASE 3, 3. 4-LETTER FROM APPLICANT REGARDING OIL WELLS, 4. 5-OIL WELL EXHIBIT
Related files: 18-85

Broken Arrow Planning Commission

12-07-2017

 

To:                     Chairman and Commission Members

From:                     Development Services Department

Title: 

title

                     Approval of PT15-117B, Conditional Final Plat, Ninety One Phase 3, 26.28 acres, A-1 to RS-3, one-quarter mile east of 9th Street, north of Washington Street

End

Background:

Applicant:                                          Kyle Sewell, Crafton Tull

Owner:                     RC Lynn Lane, LLC

Developer:                                          Rauch Coleman

Engineer:                                          Crafton Tull

Location:                     One-quarter mile east of 9th Street, north of Washington Street

Size of Tract                                          26.28 acres

Number of Lots:                     99

Present Zoning:                     A-1

Proposed Zoning:                     RS-3

Comp Plan:                                          Levels 2 and 3

 

The conditional final plat of Ninety One - Phase 3 contains 26.28 acres located one-quarter mile east of 9th Street, north of Washington Street.  Applicant wants to develop 99 single family detached residential homes on the property.  BAZ 1961, a request to change the zoning on the property associated with this plat from A-1 to RS-3 was approved by the City Council on September 6, 2016, subject to the property being platted.

 

The initial preliminary plat, Crossings at Lynn Lane, which contained 194 lots on 58.43 acres, was approved by the Planning Commission on December 17, 2015, subject to an attached checklist.  After this preliminary plat was approved by the Planning Commission, the developer acquired 26.95 additional acres.  A revised preliminary plat was reviewed and approved by the Planning Commission on August 11, 2016, subject to an attached checklist.  BAZ 1961, which requested the zoning change from A-1 to RS-3 was submitted in conjunction with the revised preliminary plat.

 

Crossing at Lynn Lane 1, which involved the first phase, was recorded in Tulsa County on September 27, 2016.  The developer later decided to change the name of the plat to Ninety-One Phase 1 and replatted the property.  Ninety-One Phase 1 was recorded in Tulsa County on June 19, 2017.  The plat for the second phase, Ninety One - Phase 2 is in the process of being recorded in Tulsa County.  As part of the approval of Ninety One - Phase 2, a 350-foot temporary roadway and utility easement was recorded that provided a second point of access for the overall Ninety One development.  With Ninety One - Phase 3, the temporary roadway and utility easement is proposed to be vacated and replaced with dedicated street right-of-way.

 

Water and sanitary sewer service to the addition will be provided by the City of Broken Arrow.

 

According to the FEMA maps, none of the property is located in a 100-year floodplain area.  However, there is a drainage swale that passes through Reserve Area 2.  Stormwater detention is being provided on the property to the east, which will become a part of the next phase of the Ninety One development.

 

While the Ninety-One addition is being developed in multiple phases, there will be one overall homeowners association responsible for the maintenance of the fencing, landscaping, and open space reserve areas for the entire development.

 

No oil wells are located on this property.  However, oil tank batteries and oil wells exist east of this property.  Information supplied by the applicant regarding these oil wells is attached.

 

The Technical Advisory Committee will review the conditional final plat for Ninety One - Phase 3 on December 5, 2017.

                     

Attachments:                                 Checklist
                                    Conditional final plat
                                    Letter from applicant regarding oil wells
                                    Oil well exhibit

Recommendation:                     Staff recommends PT15-117B, conditional final plat for Ninety One - Phase 3, be approved subject to the attached checklist.

 

Reviewed By:                                          Farhad Daroga

 

Approved By:                      Michael W. Skates

FKD:  BDM