File #: 17-2728    Name:
Type: Consent Item Status: Passed
File created: 9/25/2017 In control: Broken Arrow Municipal Authority
On agenda: 10/3/2017 Final action:
Title: Approval of and authorization to execute a Professional Consultant Agreement with Holloway, Updike and Bellen, Inc., for the Design to Replace Corroded Piping at Greens Lift Station (Project No. 185426)
Attachments: 1. 20171003 contract signed by HUB and Legal.pdf
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Broken Arrow Municipal Authority
Meeting of: 10-03-17

To: Chairman and Authority Members
From: Engineering and Construction Department
Title:
title
Approval of and authorization to execute a Professional Consultant Agreement with Holloway, Updike and Bellen, Inc., for the Design to Replace Corroded Piping at Greens Lift Station (Project No. 185426)
End
Background:
The Greens lift station, located at the Northwest corner of North 23rd Street and East 54th Street, is in need of rehabilitation. Due to time and the environment in the self-priming pump room below grade, some of the bolts, fasteners, and supports for the piping and pumping facilities have been corroded and are in need of replacement. Openings in the top slab of the pump room need to be cut in to facilitate future removal of appurtenances for repair or replacement. In addition, the adjacent above-grade building houses a large HDPE chemical tank that was used in the past to add chemicals to the sewage for odor control. The Utilities Department desires to have the tank and chemical feed equipment removed in order to make room in the building for storage and a work area. A professional consultant agreement was negotiated with Holloway, Updike, and Bellen, Inc. for the design and preparation of construction bid documents for the desired work. Staff recommends award of the Professional Consultant Agreement to Holloway, Updike, and Bellen, Inc.

Funding for the improvements will be from the Utilities Department Operations and Maintenance (O&M) budget.

Cost: $10,800.00
Prepared By: Alex M. Mills, P.E., CFM, Director of Engineering and Construction
Reviewed By: Utilities Department
Finance Department
Assistant City Manager - Operations

Approved By: Michael L. Spurgeon, City Manager