File #: 17-2606    Name:
Type: Consent Item Status: Passed
File created: 8/25/2017 In control: Broken Arrow City Council
On agenda: 9/5/2017 Final action: 9/5/2017
Title: Award the lowest responsible bid to Ellsworth Construction, LLC, and approve and authorize execution of a construction contract for Rose District Mill and Overlay (Project No. ST1819)
Attachments: 1. ST1819 Bid Tab Certified.pdf

Broken Arrow City Council

                                                                                               Meeting of: 09-05-17

                                                               

To:                     Mayor and City Council

From:                     Engineering and Construction Department

Title: 

title

                     Award the lowest responsible bid to Ellsworth Construction, LLC, and approve and authorize execution of a construction contract for Rose District Mill and Overlay (Project No. ST1819)

End

Background:

The Rose District Mill and Overlay project is a 2008 Streets GO Bond project.  The work includes street repair along Commercial and Dallas Streets from Ash Avenue to First Street, and El Paso and Fort Worth Streets from Main Street to First Street.  The project will consist of street maintenance for asphalt, Portland Cement and combined streets in Downtown Broken Arrow, to include patching, milling, and asphalt overlay.  The contractor will be required to work around previously scheduled Rose District events such as Chalk It Up; Wine, Eats, and Easels; Farmers Market, Night Out Against Crime, and Ice Rink at the Pavilion.

 

The project was advertised for bids on August 1 and 8, 2017.  Bids were opened on August 22, 2017. Six (6) bids were received.  The low bidder was Ellsworth Construction, LLC, with a bid of $248,055.80.  The engineer’s estimate was $275,220.50. The certified bid tabulation is attached.  Staff recommends award of the Base Bid for Rose District Mill and Overlay to Ellsworth Construction, LLC in the amount of $248,055.80.

 

Funds for the work are available in the 2008 Streets GO Bond.

 

Cost:                                                                $248,055.80

Prepared By:                                           Alex M. Mills, P.E., CFM, Engineering and Construction Director

Reviewed By:                                          Streets and Stormwater Department
                                    Finance Department
                                    City Attorney
                                    Assistant City Manager - Operations

 

Approved By:                      Michael L. Spurgeon, City Manager
                                  

Attachments:                                          Certified Bid Tabulation

Recommendation:

Award the lowest responsible bid to Ellsworth Construction, LLC, and authorize execution of a construction contract for Rose District Mill and Overlay.