Title: Approval of and authorization to execute Change Order C01 for Construction Contract ST1615; Fairfax Concrete Repair, Mill and Overlay
Attachments: 1. Fairfax Subdivision - Change Order #1, 2. Executed WCD #1 - ST1615
Broken Arrow City Council
Meeting of: 7-3-17

To: Mayor and City Council
From: Engineering and Construction Department
Title:
title
Approval of and authorization to execute Change Order C01 for Construction Contract ST1615; Fairfax Concrete Repair, Mill and Overlay
End
Background:
Fairfax Concrete Repair, Mill and Overlay is a 2011 General Obligation Bond project. Fairfax addition, located north of Washington Street and east of Garnett Road, has approximately 16,800 feet of asphaltic concrete and 6,200 feet of Portland cement concrete streets that are badly deteriorated. The project was advertised for bids on September 1 and 8, 2016. Bids were opened on September 27, 2016, and the project was awarded to A&A Asphalt, Inc., with a proposal of $1,301,473.20.

This Change Order #1 addresses the following additions to the contract:

1. Total Number of Days Added by this Change Order:
- None at this time, contract time will be amended in the reconcile change order.

2. Installation of 262 LF of 4" Edge Drain along various locations within the Fairfax subdivision. This installation of edge drain is required due to existence of excessive ground water under pavement identified during patching operations. This line item includes the required excavation of the 1'x1' trench below the aggregate base and installation of the separator fabric on all sides of the trench, 3/4" chips, the 4" perforated edge drain and installation into the downstream storm inlets.

As directed and documented in the attached executed Work Change Directive #1, due to excessive subgrade issues throughout the asphalt pavement Mill and Overlay portion of the project the quantities of pavement patch, asphalt pavement, aggregate base, and tack have been overrunning. Also in due to Americans with Disability Act (ADA) compliance issues with installation of associated sidewalk and ADA ramps, the project quantities of curb and...

Click here for full text