File #: 17-2089    Name:
Type: Consent Item Status: Passed
File created: 4/19/2017 In control: Broken Arrow City Council
On agenda: 5/2/2017 Final action: 5/2/2017
Title: Approve the Final Acceptance for the public improvements at Washington Lane VII, located at 2700 South 9th Street
Attachments: 1. Infrastructure Inventory, 2. Final Release and Waiver of Lien

Broken Arrow City Council

                                                                                               Meeting of: 05-02-2017

                                                                                    

To:                     Mayor and City Council

From:                     Engineering and Construction Department

Title: 

title

                     Approve the Final Acceptance for the public improvements at Washington Lane VII, located at 2700 South 9th Street

End

Background:

Morton Excavating, LLC has completed the construction for Washington Lane VII.  The required improvements are in accordance with approved construction plans and appropriate construction documents. These improvements have been constructed under the supervision of the City of Broken Arrow, Engineering and Construction Department.

 

Said Improvements are the following: (1) Water; (2) Sanitary Sewer; (3) Storm Sewer and (4) Paving.

 

The owner desires to donate the public improvements identified above to the City.  These improvements have an approximate value of $812,060.25.


Cost:                                                                $0

Prepared By:                                           Alex Mills, P.E., Director of Engineering and Construction

Reviewed By:                                          Engineering and Construction Department
                                    Finance Department
                                    Assistant City Manager-Operations
                                    Legal Department

                                   

Approved By:                      Michael L. Spurgeon, City Manager

Attachments:                                          Infrastructure Inventory
                                    Contractor’s Final Release and Waiver of Lien                     

Recommendation:

Approve the Final Acceptance of the Public Improvements at Washington Lane VII:  Water; Sanitary Sewer; Storm Sewer and Paving.