LEGISLATIVE RESEARCH CENTER
File #: 17-2075    Name:
Type: Consent Item Status: Passed
File created: 4/11/2017 In control: Broken Arrow City Council
On agenda: 4/18/2017 Final action: 4/18/2017
Title: Approval of and authorization to execute Change Order C03-Final for Construction Contract ST1203; Aspen & Kenosha Street Improvements
Attachments: 1. ST.1203 Change Order #3
Broken Arrow City Council
Meeting of: 4-18-17

To: Mayor and City Council
From: Engineering and Construction Department
Title:
title
Approval of and authorization to execute Change Order C03-Final for Construction Contract ST1203; Aspen & Kenosha Street Improvements
End
Background:
The 2011 Streets General Obligation Bond included a project described as "Repair and Overlay Aspen from Kenosha to Houston: Repair, mill and overlay streets, construct curb and construct handicap access ramps as required." Engineering and Construction (E&C) staff prepared bidding documents for the base bid from Houston to Kenosha and an additive alternate number 1 which included reinforcement fabric. E&C staff also prepared additive alternate 2 and 3 which included the mile of Washington to Houston and fabric reinforcement for that mile. The project was advertised for bids on April 13th and 20th, 2016 and bids were opened on May 10th, 2016. Ellsworth Construction, LLC, was awarded the bid with a proposal of $958,314.30 for the base bid, $120,000.00, and Add alternate II in the amount of $1,598,280.20.

This Change Order #5-Final addresses the following additions to the contract:

1. Asphalt Binder Adjustment: per contract documents, the ODOT asphalt binder adjustment is applicable to this project. The below summarized costs are to be applied to the project final documents. The summery of the binder adjustments are attached within the change order document and prepared by the project Contract Administrator and agreed upon by the contractor.

2. Reconciling Changes: Due to site conditions varying from design parameters, field
adjustments of the plan quantities by the city contract administrator was authorized.
These changes in quantities are summarized on the attached "Project Final Quantities
Report". The listed change order cost is to adjust the original contract value to the
reflected i...