LEGISLATIVE RESEARCH CENTER
File #: 17-1978    Name:
Type: Consent Item Status: Passed
File created: 3/15/2017 In control: Broken Arrow City Council
On agenda: 3/21/2017 Final action: 3/21/2017
Title: Approval of and authorization to execute Change Order Number 2 for Leisure Park I Mill and Overlay; Construction Contract ST1509A
Sponsors: Broken Arrow City Council
Attachments: 1. Change Order 02 Leisure Park I Mill and Overlay ST1509A
Broken Arrow City Council
Meeting of: 3-21-17

To: Mayor and City Council
From: Engineering and Construction Department
Title:
title
Approval of and authorization to execute Change Order Number 2 for Leisure Park I Mill and Overlay; Construction Contract ST1509A
End
Background:
Leisure Park I Mill and Overlay is a 2011 Streets General Obligation (GO) Bond project. Leisure Park subdivision, located west of Elm Place and north of Florence Street, has approximately 6,700 linear feet of asphalt streets. The project improvements were designed in-house by Engineering and Construction Department. The project was advertised for bids on September 7 and 14, 2016, and bids were opened on September 29, 2016. The low bid of $718,622.24 was submitted by H&G Paving Contractors. Funding for the improvements is from the 2011 Streets GO Bond.
This Change Order #2 addresses the following additions to the contract:
- Total Number of Days Added by this Change Order:
- Due to additional excavations and survey coordination, the contract time shall be amended to include 8 calendar days of additional time.
- Contract Changes
1) Due to plan set revisions in response to field data variations, the contractor was required to employ additional survey labor to perform (2)+ trips for reconfiguration of Hickory Street north of Austin St. The below costs are inclusive of all material, labor, and OH&P required to construct the revised plans attached at Hickory St.
2) Due to excessive water infiltration observed along Hickory Street at Waco Place, the contractor is directed to install an additional 130 linear feet of 4" underdrain with integral filter fabric and clean crushed 3/4" aggregate for drainage facilitation. Underdrain to be installed into storm box at Austin St. and Hickory St. Price is inclusive of all costs for above work. Contract Administrator to set out final extents of 130 linear feet of underdrain.
3) Due to alignment of new curb & gutter, the existing mailboxes in (2) locat...

Click here for full text