LEGISLATIVE RESEARCH CENTER
File #: 17-1969    Name:
Type: Presentations Status: Agenda Ready
File created: 3/14/2017 In control: Broken Arrow City Council
On agenda: 3/21/2017 Final action:
Title: Presentation regarding the Road Closure for Main Street between Elgin and College Streets in association with Streetscapes Phase IV Public Improvements Project
Attachments: 1. Main Street Closure Request - Dallas to Ft. Worth
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Broken Arrow City Council

                                                                                               Meeting of: 3-21-17

                                                                                    

To:                     Mayor and City Council

From:                     Engineering and Construction Department

Title: 

title

                     Presentation regarding the Road Closure for Main Street between Elgin and College Streets in association with Streetscapes Phase IV Public Improvements Project

End

Background:

The Downtown Main Street Streetscape - Phase IV is a continuation of the Rose District improvements started in 2010.  Phase IV includes improvements to Main Street between Dallas and Galveston streets and between College and Detroit streets, as well as Commercial, Dallas, El Paso, and Fort Worth streets east and west of Main Street.  Improvements include road diet, concrete and brick pedestrian paving and two mid-block pedestrian crossings, masonry seat walls and raised planters, stormwater drainage improvements, decorative street lighting, new traffic signals, signage, and striping, and a new gateway structure at the southwest corner of Main Street and Kenosha. The project was advertised for bids on June 15 and 22, 2016, with the contract being awarded to Tri-Star Construction, LLC, with a proposal of $4,988,002.23.

 

The road closure being proposed will allow for the contractor to complete the raised intersection work at the intersection of W. Detroit Street and Main Street. New concrete crosswalk with patterned concrete is to be installed along with a concrete patterned raised drive lanes. The work taking place within this work area shall also include the construction of new storm systems, waterlines, parking areas, sidewalks, and miscellaneous infrastructure 

 

Section 23-28 of the Broken Arrow Code provides for the closure of roads during construction. It provides that City personnel or contractors, while repairing of improving the streets of the city, and city personnel and utility companies, when installing, improving or repairing lines or other public facilities in the streets, are hereby authorized as necessary, subject to control by the City Manager, to close any street during the repair, maintenance or construction. Closure is, of course, predicated on the erection of proper control devices and barricades to warn and notify the public that the street has been closed to traffic.

 

The road closure will take effect from the intersection of Elgin St. and Main St. and again at College St. and Main St. A detour route will shift traffic up to side streets along either side of Main Street for the duration of 2 weeks starting April 3, 2017.

 

Traffic signs will be placed in roadway prior to closure alerting the traveling public of the pending detour.


Cost:                                                                None

Prepared By:                                           Alex Mills, P.E., Director of Engineering and Construction

Reviewed By:                                          Engineering and Construction Department                                  
                                    Assistant City Manager - Operations
                                    Legal Department
                                 

Approved By:                      Michael L. Spurgeon, City Manager
                             

Attachments:  Road closure permit by Tri-Star Construction & Detour Plan

Recommendation:  No Action Required