Approval and authorization of Final Acceptance for the public improvements at The Crossing at Lynn Lane located at Washington Street and 9th Street
End
Background:
Ira M. Green Construction has completed the construction for The Crossing at Lynn Lane. The required improvements are in accordance with approved construction plans and appropriate construction documents. These improvements have been constructed under the supervision of the City of Broken Arrow, Department of Engineering and Construction.
Said Improvements include the following: (1) Water; (2) Storm; (3) Sanitary and (4) Paving.
The owner desires to donate the public improvements identified above to the City. These improvements have an approximate value of $728,658.06.
Cost: $0
Prepared By: Alex Mills, P.E., Director of Engineering and Construction
Reviewed By: Engineering and Construction Department
Finance Department
Assistant City Manager-Operations
Legal Department
Approved By: Michael L. Spurgeon, City Manager
Attachments: Detailed Assessment Breakdown
Recommendation:
Approve the Final Acceptance of the Public Improvements: Water, Storm, Sanitary and Paving.