LEGISLATIVE RESEARCH CENTER
File #: 17-1631    Name:
Type: Consent Item Status: Agenda Ready
File created: 1/7/2017 In control: Broken Arrow City Council
On agenda: 1/17/2017 Final action:
Title: Approval of and authorization to execute Amendment No. 3 to Professional Consultant Agreement with Cowan Group Engineers, LLC (CGE) for design of Cedar Street improvements from Elgin Street to Freeport Street (Project No. ST1510)
Attachments: 1. Contract Amendment no. 3 executed by 2 parties ready fo CC agenda

Broken Arrow City Council

                                                                                               Meeting of: 01-17-17

                                                                                    

To:                     Mayor and City Council

From:                     Department of Engineering and Construction

Title:  .

title

                     Approval of and authorization to execute Amendment No. 3 to Professional Consultant Agreement with Cowan Group Engineers, LLC (CGE) for design of Cedar Street improvements from Elgin Street to Freeport Street (Project No. ST1510)

End

Background:

Cowan Group Engineers, LLC (CGE) prepared the design of Cedar Street from Detroit to Kenosha in 2015.  The street improvements were constructed from Detroit to just south of Freeport, the location of a drainage structure.  However, the drainage structure and street from there to Kenosha were not constructed because it was necessary to acquire drainage easements on both sides of the drainage structure.  Once those easements were acquired, Amendment No. 3 to the CGE agreement for design of a new reinforced concrete box and the remainder of the roadway from Elgin Street to Freeport Street, was negotiated in the amount of $8,200.00 (attached).  The revised total contract amount, including Amendments 1, 2, and 3, is $144,500.00.

 

Funding for the project is from 2008 Streets GO Bond.


Cost:                                                                $ 8,200.00

Prepared By:                                           Alex M. Mills, P.E., Director of Engineering and
                                    Construction

Reviewed By:                                          Finance Department
                                    Assistant City Manager for Operations
                                    Legal Department                           

Approved By:                      Michael L. Spurgeon, City Manager
                                   

Attachment:                                          Professional Consultant Agreement      

Recommendation:                     

                      Approve Amendment No. 3 to Professional Consultant Agreement with Cowan Group Engineers, LLC, and authorize its execution.

 

Click here to enter text.