Broken Arrow Municipal Authority
Meeting of: 08-16-16
To: Chairman and Authority Members
From: Department of Engineering and Construction
Title:
title
Approval of and authorization to execute Amendment No. 2 to the Professional Consulting Services Agreement with HDR Engineering, Inc. for odor control design of Lynn Lane Wastewater Treatment Plant Headworks Replacement (Project No. 165420 & 165423)
End
Background:
HDR Engineering, Inc., made a presentation to BAMA at the May 3, 2016 meeting regarding the most effective method of renovating the Screening and Grit Removal Facilities at the Lynn Lane Wastewater Treatment Plant (LLWWTP). The preferred solution was to construct a new Headworks facility that includes grit removal and screening in one structure. At the meeting it was requested to design for Odor Control at this new facility. The attached amendment is for the design of the Odor Control system for the Headworks facility, the construction of which is estimated to cost $1,400,000.
The HDR agreement for design of the Odor Control system is for $71,376.00.
Funding for Engineering will be from BAMA Wastewater Plant budget.
Cost: $71,376.00
Prepared By: Jeff Bigby, Acting Director of Engineering and Construction
Reviewed By: Utilities Department
Finance Department
Assistant City Manager for Operations
Legal Department
Approved By: Michael L. Spurgeon, City Manager
Attachments: Professional Consultant Agreement
Recommendation:
Approve and authorize execution of the Amendment to a Professional Consultant Agreement with HDR Engineering, Inc., for odor control design of Lynn Lane Wastewater Treatment Plant Headworks Replacement.