Title: Approval of and authorization to execute Amendment No. 2 to the Professional Consulting Services Agreement with HDR Engineering, Inc. for odor control design of Lynn Lane Wastewater Treatment Plant Headworks Replacement (Project No. 165420 & 165423)
Attachments: 1. 160802 Amend 2 with HDR for Odor Control Design LLWWTP Headworks

Broken Arrow Municipal Authority

                                                                                               Meeting of: 08-16-16

                                                                                    

To:                     Chairman and Authority Members

From:                     Department of Engineering and Construction

Title: 

title

                     Approval of and authorization to execute Amendment No. 2 to the Professional Consulting Services Agreement with HDR Engineering, Inc. for odor control design of Lynn Lane Wastewater Treatment Plant Headworks Replacement (Project No. 165420 & 165423)

End

Background:

HDR Engineering, Inc., made a presentation to BAMA at the May 3, 2016 meeting regarding the most effective method of renovating the Screening and Grit Removal Facilities at the Lynn Lane Wastewater Treatment Plant (LLWWTP).  The preferred solution was to construct a new Headworks facility that includes grit removal and screening in one structure.  At the meeting it was requested to design for Odor Control at this new facility.  The attached amendment is for the design of the Odor Control system for the Headworks facility, the construction of which is estimated to cost $1,400,000.

 

The HDR agreement for design of the Odor Control system is for $71,376.00.   

 

Funding for Engineering will be from BAMA Wastewater Plant budget.


Cost:                                                                $71,376.00

Prepared By:                                           Jeff Bigby, Acting Director of Engineering and Construction

Reviewed By:                                          Utilities Department
            Finance Department
           Assistant City Manager for Operations
           Legal Department                          

 

Approved By:                      Michael L. Spurgeon, City Manager
                               

Attachments:                                          Professional Consultant Agreement

 

Recommendation:

Approve and authorize execution of the Amendment to a Professional Consultant Agreement with HDR Engineering, Inc., for odor control design of Lynn Lane Wastewater Treatment Plant Headworks Replacement.