Title: Approval of and authorization to execute Change Order Number C03 for Construction Contract WL1611; Tulsa Water Line Connection Phase II
Attachments: 1. 160728 Change Order 03 PipeTesting, 2. Change Order #03 breakdown

Broken Arrow Municipal Authority

                                                                                               Meeting of: 08-02-16

                                                                                    

To:                     Chairman and Authority Members

From:                     Engineering and Construction Department

Title: 

title

                     Approval of and authorization to execute Change Order Number C03 for Construction Contract WL1611; Tulsa Water Line Connection Phase II

End

Background:

In order to improve the water supply system, the City of Broken Arrow, through the Broken Arrow Municipal Authority, entered into a public construction contract to make a secondary supplemental master water connection to a 48-inch diameter main water transmission line operated by the City of Tulsa (COT)/Tulsa Metropolitan Utility Authority (TMUA).  A 30-inch connection to Tulsa’s 48-inch line on the north side of Albany Street (61st Street South) would provide an additional 5 million gallons per day (MGD) during peak demand times. The project advertised for bids on April 21 and 28, 2016 and awarded to the low bidder, Daris Contractors, LLC, with a bid of $717,160.00.  Notice to proceed was issued May 31, 2016.

 

This Change Order #3 addresses the following additions to the contract:

 

 

This change order brings the total amount subject to the maximum limitation of Oklahoma Statute (O.S.) 61-121 to $6,038.81 which is 0.8%, well below the 15% restriction.  Staff recommends that the Authority approve the Change Order and authorize its execution.

 


Cost:                                                                $26,977.00

Prepared By:                                           Jeff Bigby, P.E, Acting Director of Engineering and Construction

Reviewed By:                                          Engineering and Construction Department                                  
                                    Finance Department
                                    Assistant City Manager - Operations
                                    Legal Department
                                 

Approved By:                      Michael L. Spurgeon, City Manager
                             

Attachments:                                          WL1611 Change Order Number C03 with associated Proposal Request

Recommendation:

Approve Change Order Number C03 for the Tulsa Water Line Connection Phase II project and authorize its execution.