Approval of and authorization to execute the Professional Services Agreement with Insituform Technologies, LLC for Alleyway Sewer Rehabilitation by Cured-in-Place Pipe (CIPP) and Manhole Rehabilitation; Project Number 2754340
End
Background:
The proposed Alleyway Sewer Rehabilitation Project is intended to rehabilitate aging sanitary sewer infrastructure located within the downtown Broken Arrow alleyway corridor using Cured-in-Place Pipe (CIPP) technology. The project includes the rehabilitation of approximately 1,665 linear feet of 8-inch sanitary sewer main along with the rehabilitation of associated manholes. The project extents will be in the alleyway between Main St. and S. 1st St. from E. College St. to E. Fort Worth St. This trenchless rehabilitation method will restore the structural integrity of the existing sewer system while minimizing excavation, reducing impacts to businesses and residents, and extending the service life of the City's wastewater collection system. The project area encompasses several sewer segments and manholes identified through the City's GIS mapping and condition assessments as needing rehabilitation.
The work will be completed by Insituform Technologies, LLC through the BuyBoard Cooperative Purchasing Contract #730-24, eliminating the need for a separate competitive bidding process while ensuring competitively procured pricing. The proposal includes all labor, materials, equipment, and services necessary to complete the rehabilitation, including pipeline cleaning, pre- and post-construction video inspections, bypass pumping, internal service reconnections, traffic control, confined space safety measures, and a one-year construction warranty. In addition to the CIPP lining, deteriorated manholes will be rehabilitated using the SpectraShield protective coating system to address infiltration, corrosion, and long-term structural performance.
The total estimated...
Click here for full text