Broken Arrow Drainage Advisory Committee
Meeting of: 07/29/24
Title:
title
Consideration, discussion, and possible action to recommend to City Council to expend funds to construct a culvert at South 8th Street and East Natchez Street (Case No. 24-012)
End
Background:
The proposed project at S 8th St and E Natchez St is to replace a deteriorating triple barrel culvert system and install adjacent improvements to mitigate existing conditions.
Staff investigated the site and found that the existing culverts are deteriorating, and the roadbed is eroding under the pavement.
The estimated construction costs to install new culvert and repair roadway is $750,000.00 in 2024 Dollars.
Staff is requesting $250,000.00 of the 2018 GO Bond, Proposition 6 for construction costs.
This area flows to Broken Arrow Creek.
Cost: $250,000.00
Funding Source: 2018 GO Bond, Proposition 6
Requested By: Charlie Bright, P.E., Director of Engineering and Construction
Approved By: City Manager’s Office
Attachments: Drainage Report, Exhibits
Recommendation:
recommend
Recommend to City Council the expenditure of funds to construct a culvert at S 8th St and E Natchez St
end