Title: Approval of and authorization to execute a Professional Consultant Agreement with Holloway, Updike and Bellen, Inc. for Park Lane Lift Station and Cambridge Estates Relief Line (Project No.S.24030)
Attachments: 1. Park Lane LS and Cambridge Relief Line Agreement - Legal Signed
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Broken Arrow Municipal Authority

Meeting of: 6-17-2024

 

Title:

title

Approval of and authorization to execute a Professional Consultant Agreement with Holloway, Updike and Bellen, Inc. for Park Lane Lift Station and Cambridge Estates Relief Line (Project No.S.24030)

End

 

Background:

This project consists of demolition of the existing Park Lane and Cambridge Estates lift stations and construction of a new duplex submersible lift station at the Park Lane location. Due to growing population as well as a recent wastewater study, it has been determined that the Cambridge Estates lift station and the Park Lane Lift Station are in need of significant rehabilitation. The study showed that the Cambridge Estates Lift Station can be converted to gravity by flowing to the Park Lane Lift Station. In order to meet the flow demands on the Park Lane Lift Station, the station needs to be upsized, this increase in capacity will allow the station to receive the new flow from the Cambridge Estate Lift Station relief line as well as future flows. Also included in this Agreement is the design of approximately 915 LF of 6” force main for the expanded Park Lane lift station as well as approximately 1,800 LF of 8” gravity sewer to relieve the existing Cambridge Estates lift station.

A Professional Consultant Agreement with Holloway, Updike and Bellen, Inc. has been negotiated for $218,330 to include survey, design, bidding services, and assistance during construction.

 

Cost:                                                                $218,330.00

Funding Source:                     OWRB Loan

Requested By:                      Charlie Bright, P.E., Director of Engineering & Construction

Approved By:                      City Manager’s Office

Attachments:                                          Professional Consultant Agreement

 

Recommendation:

recommend

Approve and authorize execution of a Professional Consultant Agreement with Holloway, Updike and Bellen, Inc. for Park Lane Lift Station and Cambridge Estates Relief Line (Project No.S.24030)