File #: 25-433    Name:
Type: General Business Status: Agenda Ready
File created: 3/24/2025 In control: Broken Arrow Municipal Authority
On agenda: 4/1/2025 Final action:
Title: Consideration, discussion, and possible approval of and authorization to execute a Professional Consultant Agreement with HDR Engineering, Inc. for Water and Wastewater System PFAS Compliance Study (Project No. 2554730)
Attachments: 1. 20250326-Agreement with HDR-Water and Wastewater System PFAS Compliance Study.Legal Signed-2554730

Broken Arrow Municipal Authority

Meeting of: 04-01-2025

 

Title:

title

Consideration, discussion, and possible approval of and authorization to execute a Professional Consultant Agreement with HDR Engineering, Inc. for Water and Wastewater System PFAS Compliance Study (Project No. 2554730)

End

 

Background:

The City of Broken Arrow provides reliable drinking water and wastewater services for approximately 120,000 residents. In April 2024, the Environmental Protection Agency (EPA) published its first drinking water Maximum Contaminant Limits (MCLs) for PFAS (per- and polyfluoroalkyl substances) of 4.0 ng/L for two PFAS compounds (PFOS and PFOA) and a combined Hazard Index (HI) limit for four other PFAS compounds (and individual MCLs of 10 ng/L for three of these compounds - PFHxS, Gen-X, and PFNA). All water utilities are required to begin compliance monitoring by April 2027 with MCL compliance by April 2029. This purpose of this project is for HDR Engineering, Inc. to assist in evaluating the City of Broken Arrow’s water and wastewater system with respect to the new PFAS drinking water regulations and potential wastewater implications.

The Water and Wastewater System PFAS Compliance Study Agreement has been negotiated with HDR Engineering, Inc. for $316,772.00.

 

Cost:                                                                $316,772.00

Funding Source:                     OWRB Funds

Requested By:                      Timothy S. Robins, P.E., Director of Utilities

Approved By:                      City Manager’s Office

Attachments:                                          20250326-Agreement with HDR-Water and Wastewater System PFAS Compliance Study-2554730

 

Recommendation:

recommend

Approve and authorize execution of a Professional Consultant Agreement with HDR Engineering, Inc. for Water and Wastewater System PFAS Compliance Study (Project No. 2554730)

end