Skip to main content
LEGISLATIVE RESEARCH CENTER
File #: 25-689    Name:
Type: Public Hearings Status: Agenda Ready
File created: 5/9/2025 In control: Planning Commission
On agenda: 5/22/2025 Final action:
Title: Public hearing, consideration, and possible action regarding COMP-002093-2025(Comprehensive Plan Change), Aequitas Tucson Development, 11.72 acres, Levels 2 & 3 to Levels 3 6, & Greenway/Floodplain, located approximately one-eighth mile south of Tucson Street (121st Street) and one-half mile west of Elm Place (161st East Avenue)
Attachments: 1. 2-Case Map, 2. 3-Aerial, 3. 4-Current Comprehensive Plan Map, 4. 5- Aequitas Draft PUD
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Broken Arrow Planning Commission
05-22-2025

To: Chairman and Commission Members
From: Community Development Department
Title:
title
Public hearing, consideration, and possible action regarding COMP-002093-2025(Comprehensive Plan Change), Aequitas Tucson Development, 11.72 acres, Levels 2 & 3 to Levels 3 6, & Greenway/Floodplain, located approximately one-eighth mile south of Tucson Street (121st Street) and one-half mile west of Elm Place (161st East Avenue)
End
Background:
Applicant: Wallace Design Collective
Owner: Aequitas Holdings, LLC
Developer: N/A
Engineer: Wallace Design Collective
Location: Approximately one-eighth mile south of Tucson Street (121st Street) and
one-half mile west of Elm Place (161st East Avenue)
Size of Tract 11.72 acres
Number of Lots:|910|Present Zoning: A-1 (Agricultural)
Comp Plan: Levels 2 & 3 to Levels 3 6, & Greenway/Floodplain,

COMP-002093-2025 is a request to change the Comprehensive Plan designation from Levels 2 (Urban Residential) & 3 (Transition Area) to Levels 3 (Transition Area), 6 (Regional Employment/Commercial), & Greenway/Floodplain on approximately 11.72 acres which is currently unplatted. The property is located approximately one-eighth mile south of Tucson Street (121st Street) and one-half mile west of Elm Place (161st East Avenue).

The eastern portion of this property was approved by the City Council on July 19, 2022 for RM zoning with PUD-340. PUD-340 and BAZ-2113 were approved subject to the property being platted. At this time there have been no plats filed on the property. If this comprehensive plan amendment is approved and a PUD and rezoning applied for on this parcel, the previous zoning case and PUD would be abrogated.

The applicant is requesting this change to the comprehensive plan for the purpose of developing the property for three separate uses, divided by an area of floodplain. Pending approval of this amendment to the comprehensive plan, the applicant intends to submit a rezoning r...

Click here for full text