LEGISLATIVE RESEARCH CENTER
File #: 25-582    Name:
Type: Consent Item Status: Agenda Ready
File created: 4/22/2025 In control: Broken Arrow Municipal Authority
On agenda: 5/6/2025 Final action:
Title: Approval of and authorization to execute a Professional Consultant Agreement with Doane and Hartwig Water Systems Inc. doing business as Big Wave Water Technologies Inc. for Chloramine Booster Pilot (Project No. 2554780)
Attachments: 1. 20250422-Chloramine Booster Pilot Agreement.Legal Signed-2554780
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Broken Arrow Municipal Authority

Meeting of: 05-06-2025

 

Title:

title

Approval of and authorization to execute a Professional Consultant Agreement with Doane and Hartwig Water Systems Inc. doing business as Big Wave Water Technologies Inc. for Chloramine Booster Pilot (Project No. 2554780)

End

 

Background:

The Battle Creek Water Storage Tank is a 5 MG tank that was built in 2000. Currently, there is not enough demand on the tank and lack of turnover in a water storage tank can lead to the residual chlorine in the water dropping below the minimum that is required to be in the distribution system. The purpose of this pilot study is to determine if boosting the chloramine levels in the tank will keep the residuals at an acceptable level long enough for the tank to turnover the water. This pilot study is for a 6-month rental of a trailer, a Chloramine Boosting System (CBS), related equipment, and related support services by Big Wave Water Technologies Inc. The CBS is an automated disinfectant system that gives municipal operators the capability to set and control chlorine residual levels in potable water storage tanks.

The Engineering and Construction Department and the Utilities Department negotiated a Professional Consultant Agreement with Big Wave to provide a 6-month rental of a trailer, a Chloramine Boosting System (CBS), related equipment, and related support services. The negotiated amount is $51,500.00.

 

Cost:                                                                $51,500.00

Funding Source:                     Utilities Budget

Requested By:                      Charlie Bright, P.E., Director of Engineering & Construction

Approved By:                      City Manager’s Office

Attachments:                                          20250422-Chloramine Booster Pilot Agreement.Legal Signed-2554780.

 

Recommendation:

recommend

Approve and authorize execution of a Professional Consultant Agreement with Doane and Hartwig Water Systems Inc. doing business as Big Wave Water Technologies Inc. for Chloramine Booster Pilot (Project No. 2554780)