File #: 15-475    Name:
Type: Consent Item Status: Passed
File created: 9/25/2015 In control: Broken Arrow City Council
On agenda: 10/6/2015 Final action: 10/6/2015
Title: Acceptance of a 20-foot-wide utility easement and a 10-foot-wide temporary construction easement located southeast of the intersection of Florence Street (111th Street South) and Aspen Avenue (145th East Avenue) in the Northeast Quarter of Section 33, T18N, R14E from the Carolyn J. Morris Trust, for Sanitary Sewer Improvements Aspen Creek Relief Line (Project No. S.1307)
Attachments: 1. 150925 Utility Easement Morris, 2. 150925 Temporary Construction Easement Morris

Broken Arrow City Council

Meeting of: 10-06-2015

 

To:                     Mayor and City Council

From:                     Department of Engineering and Construction

Title:

title

                     Acceptance of a 20-foot-wide utility easement and a 10-foot-wide temporary construction easement located southeast of the intersection of Florence Street (111th Street South) and Aspen Avenue (145th East Avenue) in the Northeast Quarter of Section 33, T18N, R14E from the Carolyn J. Morris Trust, for Sanitary Sewer Improvements Aspen Creek Relief Line (Project No. S.1307)

End

Background:

The attached 20-foot Utility Easement (total 14,181.88 square feet) and 10-foot Temporary Construction Easement (total 10,850.46 square feet) are conveyed to the City of Broken Arrow by the Carolyn J. Morris Trust.in exchange for $14,181.00 compensation and a service tap.  The compensation of $1.00 per square foot for the permanent easement is considered reasonable. No compensation is required for the temporary construction easement.  The easements are required for the Aspen Creek Relief Line, a gravity sanitary sewer line that when constructed, will allow the removal of two lift stations (the Grey Oaks and the Florence Street stations).

Funding for the easement is from Oklahoma Water Resources Board (OWRB) Loan No. FAP-16-0001-L.  Staff recommends that the Council accept the Utility Easement and the Temporary Construction Easement.

Cost:                                                                $14,181.00

Prepared By:                                           Douglas L. Tiffany, P.E., Director of Engineering and Construction

Reviewed By:                                          Utilities Department
                                    Finance Department
                                    Legal Department
                                    Assistant City Manager

Approved By:                      Michael L. Spurgeon, City Manager

Attachments:                                          Utility Easement
                                    Temporary Construction Easement

Recommendation:

Accept the Utility Easement and Temporary Construction Easement.