Broken Arrow Drainage Advisory Committee
Meeting of: 11-16-26
Title:
title
Acceptance of the Drainage Advisory Committee’s recommendation to close project SW22050 Cedar Ridge Estates and return the $3,080.73 of the 2018 General Obligation Bond funds to the appropriate basin
End
Background:
The project SW22050 Cedar Ridge Estates was for assistance with mitigating drainage concerns in the Cedar Ridge Estates subdivision
Council approved $5,000.00 of funds to perform a survey.
Staff contracted with a survey company with a cost of $1,920.00
The design was done in house
Council approved $80,000.00 of funds for construction. All of these funds were used in the construction of the improvements. Additional funds from a separate source were used to finish the work within the Right of Way
The remaining balance of $3,080.73 is from the survey and is to be transferred back into the corresponding basin fund
This is in the Haikey Creek Basin
Cost: $0.00
Funding Source: 2018 GO Bond, Proposition 6
Requested By: Charlie Bright, P.E., Director of Engineering and Construction
Approved By: City Manager’s Office
Attachments: 20261015 SW22050 Cedar Ridge Estates Closeout
Recommendation:
recommend
Accept the Draiange Advisory Committee Recommendation to close project SW22050 Cedar Ridge Estates and return the $3,080.73 of the 2018 General Obligation Bond funds to the appropriate Basin
end