title
Acceptance of the Drainage Advisory Committee’s recommendation to close project SW24050 Glen Eagles V and return the $7,502.00 of the 2018 General Obligation Bond funds to the appropriate basin. Original Agenda Item Number 23-1254
End
Background:
The project SW24050 Glen Eagles V was to perform a survey to aid in the possible design of mitigation of nuisance water.
Council approved $15,000.00 of funds for a survey on 01-16-24. The City of Broken Arrow contracted with a surveying company to perform the survey for $7,498.00.
The survey found the drainage path surveyed contained multiple utilities and a shallow rock ledge that would complicate any alteration of the flow path. Due to higher than anticipated costs, and the limited scale of public benefit design of the project was not recommended to move forward.
This is in the Spunky Creek Basin
Cost: $0.00
Funding Source: 2018 GO Bond, Proposition 6
Requested By: Charlie Bright, P.E., Director of Engineering and Construction
Approved By: City Manager’s Office
Attachments: SW24050 Glen Eagle V Closeout Signed
Recommendation:
recommend
Accept the Drainage Advisory Committee recommendation to close project Glen Eagles V and return the $7,502.00 of the 2018 General Obligation funds to the appropriate Basin. Original Agenda Item number 23-1254