File #: 26-576    Name:
Type: General Business Status: Agenda Ready
File created: 4/24/2026 In control: Drainage Advisory Committee
On agenda: 4/27/2026 Final action:
Title: Consideration, discussion and possible action to recommend to Council to expend funds to obtain a feasibility study to assess the health of a channel in the Aspen Pond subdivision (Case No. 26-013)
Attachments: 1. 26-013 Packet
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Broken Arrow Drainage Advisory Committee

Meeting of: 04-27-2026

 

Title:

title

Consideration, discussion and possible action to recommend to Council to expend funds to obtain a feasibility study to assess the health of a channel in the Aspen Pond subdivision (Case No. 26-013)

End

 

Background:

Channel runs along the Reserve D for Aspen Pond subdivision, platted in 2008. It is the end of a multi subdivision drainage path that flows into the East Branch of Haikey Creek. The neighboring school property has not been platted but was constructed in 1974.

The concrete walls of the channel have begun to fail and buckle in some areas. One section of the school property has begun eroding and the school’s fence along the west side of the property has also begun to fail.

There are electrical transmission and distribution lines along the west side of the channel that may be affected by future erosion.

The Homeowner’s Association has asked the City for help.  Staff is requesting a feasibility study performed by an outside engineering firm to assess the health of the channel and possible solutions.

This is in the Haikey Creek Basin

Staff is requesting $30,000.00 of the 2018 General Obligation Bond Proposition 6 funds to obtain a feasibility study from an outside engineering firm to assess the health of the channel and possible solutions

 

Cost:                                                                $30,000.00

Funding Source:                     2018 General Obligation Bond, Proposition 6

Requested By:                      Charlie Bright, P.E., Director of Engineering and Construction

Approved By:                      City Manager’s Office

Attachments:                                          Drainage Report, Exhibits   

 

Recommendation:

recommend

Recommend to Council the expenditure of funds to obtain a feasibility study to assess the health of a channel in the Aspen Pond subdivision (Case No. 26-013)

end