Broken Arrow Municipal Authority
Meeting of: 03-03-2026
Title:
title
Approval of and authorization to execute a Professional Consultant Agreement with HDR Engineering, Inc. for the Windsor Lift Station Expansion or Elimination project (S.26030)
End
Background:
The Windsor Lift Station is located at 1703 West Miami Street in Broken Arrow on the south end of the Windsor Oaks subdivision. The lift station was put into operation in 1982 and the pumps were rehabilitated in 2023 to submersible pumps. This lift station receives flow from the Windsor Oaks and Windsor Estates subdivisions and the new developments including Reasor’s along Norfolk Drive. The lift station needs additional expansion as development continues in this area or to be eliminated and converted to a gravity sewer line if possible. The first step in this project will be to determine the feasibility of eliminating this station. HDR Engineering, Inc. has been selected to evaluate a few different options for eliminating the station and providing cost comparisons for these options verses expansion.
Engineering and Construction Department negotiated a Professional Consultant Agreement with HDR Engineering, Inc. to prepare a technical memorandum that investigates expansion of the Windsor Lift Station or feasibility of elimination The negotiated agreement amount is $34,958.00.
Cost: $34,958.00
Funding Source: OWRB Loan
Requested By: Charlie Bright, P.E., Director of Engineering & Construction
Approved By: City Manager’s Office
Attachments: Windsor LS Agreement with HDR.Legal Signed-S.26030
Recommendation:
recommend
Approve and authorize execution of a Professional Consultant Agreement with HDR Engineering, Inc. for the Windsor Lift Station Expansion or Elimination project (S.26030)
end