Skip to main content
LEGISLATIVE RESEARCH CENTER
File #: 26-299    Name:
Type: Consent Item Status: Agenda Ready
File created: 2/18/2026 In control: Broken Arrow Municipal Authority
On agenda: 3/3/2026 Final action:
Title: Approval of and authorization to execute a Professional Consultant Agreement with HDR Engineering, Inc. for the Windsor Lift Station Expansion or Elimination project (S.26030)
Attachments: 1. 20260218-Windsor LS Agreement with HDR.Legal Signed-S.26030
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Broken Arrow Municipal Authority

Meeting of: 03-03-2026

 

Title:

title

Approval of and authorization to execute a Professional Consultant Agreement with HDR Engineering, Inc. for the Windsor Lift Station Expansion or Elimination project (S.26030)

End

 

Background:

The Windsor Lift Station is located at 1703 West Miami Street in Broken Arrow on the south end of the Windsor Oaks subdivision. The lift station was put into operation in 1982 and the pumps were rehabilitated in 2023 to submersible pumps. This lift station receives flow from the Windsor Oaks and Windsor Estates subdivisions and the new developments including Reasor’s along Norfolk Drive. The lift station needs additional expansion as development continues in this area or to be eliminated and converted to a gravity sewer line if possible. The first step in this project will be to determine the feasibility of eliminating this station. HDR Engineering, Inc. has been selected to evaluate a few different options for eliminating the station and providing cost comparisons for these options verses expansion.

Engineering and Construction Department negotiated a Professional Consultant Agreement with HDR Engineering, Inc. to prepare a technical memorandum that investigates expansion of  the Windsor Lift Station or feasibility of elimination The negotiated agreement amount is $34,958.00.

 

Cost:                                                                $34,958.00

Funding Source:                     OWRB Loan

Requested By:                      Charlie Bright, P.E., Director of Engineering & Construction

Approved By:                      City Manager’s Office

Attachments:                                          Windsor LS Agreement with HDR.Legal Signed-S.26030

 

Recommendation:

recommend

Approve and authorize execution of a Professional Consultant Agreement with HDR Engineering, Inc. for the Windsor Lift Station Expansion or Elimination project (S.26030)

end