Broken Arrow Drainage Advisory Committee
Meeting of: 11-16-26
Title:
title
Acceptance of the Drainage Advisory Committee’s recommendation to close project SW23030 Shenandoah Valley Pond Outlet and return the $12,607.28 of the 2018 General Obligation Bond funds to the appropriate basin
End
Background:
The project SW23030 Shenandoah Valley Pond Outlet was for assistance with the repair of a failing outlet for the pond shared by the subdivisions Shenandoah Valley I and II
Council approved $86,500.00 of funds to implement a design that was provided by an earlier project
Staff contracted with a construction contractor to perform the work. This expenditure was $73,892.72
The remaining balance of $12,607.28 is to be transferred back into the corresponding basin fund
This is in the Sugar Creek Basin
Cost: $0.00
Funding Source: 2018 GO Bond, Proposition 6
Requested By: Charlie Bright, P.E., Director of Engineering and Construction
Approved By: City Manager’s Office
Attachments: 20261016 SW23030 Shenandoah Valley Closeout
Recommendation:
recommend
Accept the Drainage Advisory Committee Recommendation to close project SW23030 Shenandoah Valley Pond Outlet and return the $12,607.28 of the 2018 General Obligation Bond funds to the appropriate Basin
end