Title: Consideration, discussion, and possible action for approval of and authorization to award to the lowest responsible bidder, Builder's Unlimited, Inc., authorization to execute a construction contract for the Kenosha Sidewalk Project (ST23290) and approve and authorize a project transfer from ST26080 to ST23290
Attachments: 1. 20260310-Bid Tabulation-ST23290, 2. 20260318 - Budget Transfer - ST23290

Broken Arrow City Council

Meeting of: 03-24-2026

 

Title:

title

Consideration, discussion, and possible action for approval of and authorization to award to the lowest responsible bidder, Builder’s Unlimited, Inc., authorization to execute a construction contract for the Kenosha Sidewalk Project (ST23290) and approve and authorize a project transfer from ST26080 to ST23290

End

Background:

The sidewalk along Kenosha Street is incomplete from approximately Sycamore Avenue and Narcissus Avenue on both the north and south sides of Kenosha. The Engineering and Construction Department selected Garver Engineering to design a project that will complete the pedestrian path on both the north and south sides of the roadway.

The project was advertised February 3 and February 10, 2026. Bids were opened March 10, 2026 with four bids received, all of which were responsive. A certified bid tabulation is attached. The bids submitted were composed of forty-two (42) pay items to form the total base bid. The lowest responsible bidder was Builder’s Unlimited, Inc. with a total bid of $324,239.76. The total engineer’s estimate for this project was $382,184.00.

The project will be funded by the 2018 GO Bond Proposition 1 and a transfer from the Street Sales Tax Fund “To be Determined” project, ST26080.

 

Cost:                                                                $324,239.76

Funding Source:                     2018 GO Bond Fund and Street Sales Tax Fund

Requested By:                      Charlie Bright, PE, Director of Engineering and Construction                                    

Approved By:                      City Manager’s Office

Attachments:                                          Certified bid tabulation; Intradepartmental Budget Transfer

                         

Recommendation:

recommend

Approve and authorize award to the lowest responsible bidder, Builder’s Unlimited, Inc. and authorize execution of a construction contract for the Kenosha Sidewalk Project (ST23290) and approve and authorize a project transfer from ST26080 to ST23290.

end