LEGISLATIVE RESEARCH CENTER
File #: 24-1506    Name:
Type: Consent Item Status: Agenda Ready
File created: 11/4/2024 In control: Broken Arrow City Council
On agenda: 11/19/2024 Final action:
Title: Acceptance of the Drainage Advisory Committee's recommendation to approve expenditure of 2018 General Obligation (GO) Bond, Proposition 6 funds for design of erosion control measures in the Bristol Ponds south detention pond and in the channel between Bristol Ponds and Elm Place
Attachments: 1. 24-016 Packet
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Broken Arrow City Council

Meeting of: 11/19/24

 

Title:

title

Acceptance of the Drainage Advisory Committee’s recommendation to approve expenditure of 2018 General Obligation (GO) Bond, Proposition 6 funds for design of erosion control measures in the Bristol Ponds south detention pond and in the channel between Bristol Ponds and Elm Place

End

 

Background:

The case was brought before the Drainage Advisory Committee on October 28, 2024. The Committee voted 7-0 to recommend approval of expenditure of funds.

The proposed project is near the Bristol Ponds subdivision located west of Elm Place and north of Washington St.

Staff investigated the site and found that the channel on both public and private does not appear to have been constructed per plan.  It appears that erosive velocities were not mitigated.  Erosion is present along the channel and the pond bank.

Bristol Ponds is a private subdivision platted in 2005. The City owns the channel between Bristol Ponds and Elm Place. The City also owns land south of the pond. The pond and its bank is privately owned. This area flows to Haikey Creek.

The estimated design cost to engineer erosion control measures is approximately $50,000.00 in 2024 Dollars.

 

Cost:                                                                $50,000.00

Funding Source:                     2018 GO Bond, Proposition 6

Requested By:                      Charlie Bright, P.E., Director of Engineering and Construction

Approved By:                      City Manager’s Office

Attachments:                                          Drainage Report, Exhibits   

 

Recommendation:

recommend

Accept the Drainage Advisory Committee’s recommendation to approve expenditure of 2018 GO Bond, Proposition 6 funds to design erosion control measures in the Bristol Ponds south detention pond and in the channel between Bristol Ponds and Elm Place.

end