LEGISLATIVE RESEARCH CENTER
File #: 15-430    Name:
Type: Consent Item Status: Passed
File created: 9/8/2015 In control: Planning Commission
On agenda: 9/24/2015 Final action: 9/24/2015
Title: Consideration and possible action regarding BAL 1081, Deitz Lot Split, 10.00 acres, A-1, one-half mile south of Tucson Street, east of Olive Avenue
Attachments: 1. 2-CASE MAP.BAL-1081.pdf, 2. 3A-LEGAL DESCRIPTION FOR OVERALL PARCEL.BAL 1081.pdf, 3. 3B-LEGAL DESCRIPTIONS FOR TRACT 1 AND TRACT 2.BAL 1081.pdf, 4. 4-AERIAL.BAZ 1081.pdf
Broken Arrow Planning Commission
09-24-2015

To: Chairman and Commission Members
From: Development Services Department
Title:
title
Consideration and possible action regarding BAL 1081, Deitz Lot Split, 10.00 acres, A-1, one-half mile south of Tucson Street, east of Olive Avenue
End

Background:
Applicant: W. Joe and Gayle M. Deitz
Owner: W. Joe and Gayle M. Deitz
Developer: W. Joe and Gayle M. Deitz
Surveyor: Tom A. Hayes, White Surveying Company
Location: One-half mile south of Tucson Street, east of Olive Avenue
Size of Tract 10.00 acres
Number of Lots:|913|
Present Zoning: A-1
Comp Plan: Level 2 and Greenway/Floodplain

Lot split request BAL 1081 involves a 10.00 acre parcel located one-half mile south of Tucson Street, east of Olive Avenue. Applicant is requesting to split the property into two equal size lots. Their residence is currently on the south tract. They are proposing to build a new residence on the north tract. The A-1 district only allows one residential structure per lot. As a result, they are requesting to split the property in half.

The property presently has 658.75 feet of frontage along Olive Avenue. With the proposed lot split, the lots will have 329.37 feet of frontage onto Olive Avenue, which is slight less than the 330 feet of frontage required by the Zoning Ordinance. In the past, the Planning Commission has approved similar type requests. The lot meets the minimum lot size and building setback requirements of the A-1 district.

Water to the existing residence on Tract 2 is presently provided by a well. A new subdivision (Stone Horse of Broken Arrow) is under construction immediately south of the property associated with BAL 1081. Applicant is exploring the possibility of being able to connect both lots onto the water system at Stone Horse. If this cannot be achieved, a new well will be constructed on Tract 1. The main water line along Olive Avenue stops with the Stone Horse developm...

Click here for full text