Broken Arrow City Council
Meeting of: 02-03-2026
Title:
title
Consideration, discussion, and possible approval of and authorization to award to the lowest responsible bidder, Cherokee Pride Construction, Inc., a construction contract for 9th Street and Washington Street Intersection Improvements (Project No. ST2027 - Phase 1)
End
Background:
As part of Proposition 1 of the 2018 GO Bond, this project was designed by Garver for construction and includes rehabilitation and widening of the existing paving to five (5) lanes on 9th Street north and south of Washington Street, and five (5) lanes on Washington Street east and west of 9th Street at the intersection. The project also includes construction of sidewalk, ADA curb ramps at the intersection, and new traffic and pedestrian signals.
The project was advertised for bid on December 30th, 2025. Bids were opened on January 20th, 2026 with 6 bids received, all of which were responsive. The certified bid tab is attached.
The bids submitted were composed of 89 total pay items to form the total base bid. The lowest responsible bidder was Cherokee Pride Construction, Inc. with a total base bid of $2,256,008.20. The total engineer’s estimate for the project was $2,665,105.90.
Cost: $2,256,008.20
Funding Source: 2018 GO Bond - Proposition 1
Requested By: Charlie Bright, PE, Director of Engineering and Construction
Approved By: City Manager’s Office
Attachments: Certified Bid Tabulation
Recommendation:
recommend
Approve and authorize award to the lowest responsible bidder, Cherokee Pride Construction, Inc., for a construction contract for 9th Street and Washington Street Intersection Improvements (Project No. ST2027 - Phase 1)