Title: Approval of and authorization to execute Agreement for Professional Consulting Services with Wallace Design Collective for the design of a regional detention pond near Tucson Street and Aspen Avenue (Project Number (SW25090)
Attachments: 1. SW25090 Aspen Regional Pond Contract_Legal Signed
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Broken Arrow Economic Development Authority

Meeting of: 04/15/2025

 

Title:

title

Approval of and authorization to execute Agreement for Professional Consulting Services with Wallace Design Collective for the design of a regional detention pond near Tucson Street and Aspen Avenue (Project Number (SW25090)

End

 

Background:

The City is looking into adding a City owned regional detention facility in south Broken Arrow near West Tucson Street and South Aspen Avenue. Two locations are to be evaluated; one area is north of the Creek Turnpike adjacent to the Aspen Ridge Business Park and the second area is just north of West Tucson Street west of the Warren Theatre.

The detention facility would provide detention for future commercial development at the northeast corner of West Tucson Street and South Aspen Avenue. The purpose of the detention facility is to ensure that there is no increase in runoff or adverse impact to downstream properties from the future commercial development.

The funds requested are for hiring an engineering consultant to perform the conceptual detention analysis and design, and to determine if either of these locations noted above would be viable options for a regional detention facility.

This area flows to the Aspen Creek watershed.

 

 

Cost:                                                                $90,000.00

Funding Source:                     Broken Arrow Economic Development Authority

Requested By:                      Charlie Bright, P.E., Director of Engineering and Construction

Approved By:                      City Manager’s Office

Attachments:                                          Agreement for Professional Consulting Services

 

Recommendation:

recommend

Approve and authorize execution of Agreement for Professional Consulting Services with Wallace Design Collective for the design of a regional detention pond near Tucson Street and Aspen Avenue (Project Number SW25090)

end