Broken Arrow Drainage Advisory Committee
Meeting of: 07-28-2025
Title:
title
Consideration, discussion, and possible action to recommend to City Council to expend construction funds to replace a retaining wall along Liberty Trail (Case No. 25-016)
End
Background:
This project is located on Liberty Trail that runs along the north side of the Creek Turnpike in Broken Arrow.
The wall is a segmental block retaining wall that has visible signs of distress and potential failure, per an evaluation completed by McGuire Civil Engineering Services, LLC in May of 2025. A pronounced bulge has developed in a section of the wall, where several blocks have dislodged from the earth fill behind them. The wall is located downslope from the turnpike approximately 35 feet away, with no evident drainage infrastructure to intercept runoff from the road. Runoff flows appear to be flowing directly toward the wall. The wall also does not have any weep holes or gravel backfill zone, which are standard design requirements per the evaluation provided by McGuire Civil Engineering Services, LLC.
The approximate length of the wall is 1,000 linear feet and the height varies from 8 inches to 7.5 feet in height.
Staff is requesting $350,000.00 of the 2018 General Obligation Bond Proposition 6 for funds to construct a new retaining wall.
This area flows to Elm Creek.
Cost: $350,000.00
Funding Source: 2018 General Obligation Bond, Proposition 6
Requested By: Charlie Bright, P.E., Director of Engineering and Construction
Approved By: City Manager’s Office
Attachments: Drainage Report, Exhibits
Recommendation:
recommend
Recommend to City Council the expenditure of construction funds to replace a retaining wall along Liberty Trail
end