Background:
This Project includes excavation, grading, creating a drainage channel, approximately 614 Linear Feet of 18" polypropylene drainage pipe, and culverts. Project also includes erosion control, removal and replacement of sidewalks and driveways, construction staking, and other utility construction activities. Project is to address erosion along the channel and improve stormwater flow along Houston St. This project is located along Houston Street from Fort Worth Street to South 9th Street in Broken Arrow, OK. Construction time for this contract will be One Hundred Fifty (150) Calendar days. This Project was advertised with the 12" Waterline and Bore Improvements in the same area (Project 2254401) to ensure proper coordination and efficiency with work for both projects.
At the City Council meeting held on November 17, 2025, City Council approved the award to the lowest responsible bidder, Gober Construction LLC, for the Old Town Houston St. Storm Water Improvements Fort Worth St. to S. 9th St. and authorized the execution of the construction contract. The approved lowest responsible bid was in the amount of $565,940.00, with an Engineer's Estimate of $686,285.00. The approved funding mechanism to be utilized was the Storm Water Capital funds, however, the funding from Proposition 5 of the 2018 GoBond will also be utilized in the completion of this project.
Staff recommends ratifying the previously approved award of the lowest responsible bidder and authorization to execute a construction contract for the Old Town Houston St. Storm Water Improvements Fort Worth St. to S. 9th St.
Cost: $565,940.00
...