Legislation Details

File #: 26-837    Name:
Type: Consent Item Status: Agenda Ready
File created: 6/3/2026 In control: Broken Arrow City Council
On agenda: 6/15/2026 Final action:
Title: Approval of and authorization to execute the Change Order #2 with Cherokee Pride Construction, Inc. for the Carriage Crossing Residential Rehab Project (ST25310)
Attachments: 1. Carriage_Crossing_Change_Order_2
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Broken Arrow City Council

Meeting of: 06-15-2026

 

Title:

title

Approval of and authorization to execute the Change Order #2 with Cherokee Pride Construction, Inc. for the Carriage Crossing Residential Rehab Project (ST25310)

End

 

Background:

 The Carriage Crossing Residential Rehab project is to improve the residential roads to be fixed. Roughly half of the project was asphalt streets while the other half is concrete. The project will also address some driveway and sidewalk issues.     

Change Order #2 addresses the following additions/deletions/changes to the contract:

-                     This Change Order reconciles what was installed in the field. There was more damage than originally thought and more panels needed to be replaced. Drainage valley gutters needed to be replaced and steep curb openings needed to be installed.

 

-                     There is a 18 day change in contract time.

 

 The total cost for Change Order #2 amounts to $174,267.60

The additional cost associated with these changes is as follows:

Previous Change Orders:                                          $40,000.00

This Change Order(s):                                                               $174,267.60

Total Cost of Change Orders:                                          $214,267.60

Original Contract Amount:                                          $1,427,226.75

Revised Contract Amount:                                          $1,641,494.35

 

Percent Change in Contract:                                          15.01%

Applicable to Comp. Bid Act:                     2.80%

Cost:                                                                $174,267.60

Funding Source:                     2018 GO Bond

Requested By:                      Charlie Bright, PE, Director of Engineering and Construction

Approved By:                      City Manager’s Office

Attachments:                                          Carriage Crossing Change Order 2
 

Recommendation:

recommend

Approve and authorize execution of Change Order #2 with Cherokee Pride Construction, Inc. for the Carriage Crossing Residential Rehab Project (ST25310)

end