The roadway and underground infrastructure within Arrow Forge is near completion. In an effort to continue moving the project forward, the Engineering and Construction Department advertised a contract for the street lighting that will provide safety, security and appealing aesthetics to the streets within Arrow Forge.
The project was advertised December 2 and December 9, 2025. Bids were opened January 6, 2026 with five bids received, all of which were responsive. A certified bid tabulation is attached. The bids submitted were composed of thirteen (13) pay items to form the total base bid. The lowest responsible bidder was Davis H Elliot Construction Company, Inc with a total bid of $528,174.20. The total engineer’s estimate for this project was $879,989.30.
Cost: $528,174.20
Funding Source: Street Light Fund (342)
Requested By: Charlie Bright, PE, Director of Engineering and Construction
Approved By: City Manager’s Office